Scheduling Machine Maintenance at the Krembung Sugar Factory Using the Reliability Centered Maintenance Method
Penjadwalan Perawatan Mesin Pada Stasiun Dipabrik Gula Krembung Dengan Menggunakan Metode Reliability Centered Maintenance
DOI:
https://doi.org/10.21070/pels.v10i1.3104Keywords:
Reliability Centered Maintenance, Mean Time Between Failure, Preventive Scheduling, Equipment Reliability, Operational AvailabilityAbstract
General Background Manufacturing continuity relies entirely on the structural integrity and operational readiness of critical machinery. Specific Background Sugar factories utilizing continuous operational models frequently face sudden mechanical breakdowns, resulting in severe production downtime and excessive emergency repair expenditures. Knowledge Gap Although unexpected mechanical failures severely disrupt production, many factories still lack a quantitatively determined, scheduled maintenance framework based on exact reliability metrics and historical failure intervals. Aims This study determines an optimal maintenance schedule for sugar processing machinery utilizing the Reliability-Centered Maintenance methodology. Results Analysis of 11 failure occurrences yielded a Mean Time to Repair of 0.5364 hours and a Mean Time Between Failure of 29.299 hours. The machinery's operational reliability dropped to 44.08 percent within a 24-hour cycle, despite maintaining a high availability rate of 98.20 percent. Stasiun Pemurnian and Stasiun Gilingan recorded the highest failure frequencies, primarily driven by bearing wear, continuous overloading, severe overheating, and oil contamination. Novelty This research directly translates specific component failure metrics and 24-hour cycle reliability limits into a highly structured, data-driven preventative maintenance timeline for sugar processing operations. Implications Executing a mandated preventative maintenance protocol every two days ensures components are serviced before reaching critical failure limits, substantially minimizing unplanned downtime and securing operational efficiency.
Highlights:
-
Unplanned mechanical breakdowns significantly disrupt continuous sugar processing operations, requiring structured maintenance interventions based on exact reliability metrics.
-
Machinery analysis revealed a 29.299-hour Mean Time Between Failure and a 44.08 percent operational reliability limit during a standard 24-hour cycle.
-
Mandating a strict preventative maintenance schedule every two days mitigates unexpected downtime and successfully addresses critical overheating and bearing failures.
Keywords: Reliability Centered Maintenance, Mean Time Between Failure, Preventive Scheduling, Equipment Reliability, Operational Availability
Downloads
References
M. R. W. F. D. Winati, “Penjadwalan Perawatan Mesin di CV Wijaya Workshop dengan Pendekatan Reliability Centered Maintenance (RCM),” J. TRINISTIK, vol. 1, no. 1, pp. 37–43, 2022.
N. M. Yuli Setiawannie, “Perencanaan Penjadwalan Preventive Maintenance Mesin Pounch dengan Critical Path Method di PT. Grafika Nusantara,” INSOLOGI: Jurnal Sains dan Teknologi, vol. 1, no. 1, pp. 1–10, 2022, doi: 10.55123/insologi.v1i1.105.
M. Pradipa Rosianto, H. Rarindo, and B. W., “Metode RCM untuk penjadwalan perawatan pada kendaraan RCM,” J. Teknol., vol. 17, no. 2, pp. 29–36, 2023.
K. Puddin et al., “Analisis hambatan produksi dan efektivitas sistem pemeliharaan preventive maintenance pabrik PT. Nippon Indosari Corpindo Medan,” Optim.: Jurnal Ekonomi dan Manajemen, vol. 6, no. 1, pp. 87–102, 2026.
Y. S. K. Santosa and R. Prasetyo, “Perawatan dan penjadwalan mesin cutting-sawing menggunakan metode RCM,” JAPTI: Jurnal Aplikasi Ilmu Teknik Industri, vol. 6, no. 1, pp. 28–34, 2025.
D. C. S. Putra and E. P., “Analisis manajemen perawatan mesin produksi kemasan plastik spout dengan metode Reliability Centered Maintenance (RCM),” J. Penelit. Rumpun Ilmu Tek., vol. 3, no. 3, pp. 117–128, 2024. [Online]. Available: https://doi.org/10.55606/juprit.v3i3.4236
H. Azhari, J. G. Ganap, and F. A. Nisah, “Analisis perawatan mesin kapal dengan metode Reliability Centered Maintenance (RCM) di PT Jasa Armada Indonesia Tbk,” INDUSTRIKA, vol. 8, no. 2, pp. 407–417, 2024. [Online]. Available: https://jurnal.utb.ac.id/index.php/indstrk
Y. Mauluddin, D. Rahmawati, and D. Oktavianti, “Perencanaan pemeliharaan mesin produksi dengan menggunakan Total Productive Maintenance untuk menjamin kestabilan proses produksi,” J. Kalibr., vol. 20, no. 2, pp. 86–92, 2022.
M. Y. Apandi, B. Sena, and N. Burhan, “Analisis penerapan Total Productive Maintenance (TPM) pada mesin press menggunakan metode Reliability Centered Maintenance (RCM),” Blend Sains J. Tek., vol. 4, no. 2, pp. 461–468, 2026, doi: 10.56211/blendsains.v4i2.850.
A. Herlambang, S. Amri, N. Marikena, and R. O. Manullang, “Sosialisasi penjadwalan perawatan mesin produksi dengan metode Reliability Centered Maintenance (RCM) pada CV. Adi Makmur Metalindo,” CORAL (Community Service Journal), vol. 4, no. 1, pp. 66–75, 2025.
S. P. Samudera and M. Abdulrahim, “Penjadwalan perawatan komponen kritis mesin tube mill pembuat pipa baja (studi kasus: CV. Perjuangan Steel Surabaya),” Innov. J. Soc. Sci. Res., vol. 4, no. 3, pp. 16112–16130, 2024. [Online]. Available: https://j-innovative.org/index.php/Innovative
T. Sukmono and O. A. Nastiti, “Optimasi penjadwalan produksi menggunakan metode total waktu produksi,” Ind. Inov. – J. Tek. Ind. ITN Malang, pp. 155–160, 2024.
D. Wahjudi, R. Lim, and E. Budi, “Perancangan sistem penjadwalan perawatan yang mendukung Total Productive Maintenance di P.T. X,” J. Dimens. Ins. Prof., vol. 2, no. 1, pp. 48–55, 2024. [Online]. Available: https://doi.org/10.9744/jdip.2.1.48-55
L. Alice, S. Costa, F. Agusti, and I. W. Utami, “Perancangan perawatan dan penjadwalan preventive maintenance mesin stitching berbasis metode Reliability Centered Maintenance (RCM) di CV Madyotomo,” J. Sci. Innov. Technol., vol. 6, no. 1, pp. 32–44, 2025.
T. Z. Husna and H. Murnawan, “Optimasi penjadwalan perawatan mesin ultrasonography untuk meminimalkan biaya kerusakan komponen (studi kasus: Rumah Sakit X),” J. Ilm. Tek. dan Manaj. Ind., vol. 3, no. 2, pp. 1400–1413, 2023.
A. R. Fadillah and N. A. Fitriani, “Penerapan metode Reliability Centered Maintenance dalam perencanaan perawatan komponen mesin giling,” J. Ilm. Ilmu Tek. Mesin, Ind. Komput., vol. 1, no. 1, pp. 1–10, 2025. [Online]. Available: https://jurnal.muaraedukasi.id/index.php/muratek
M. R. Abidin, S. S. Dahda, and D. Andesta, “Perencanaan penjadwalan perawatan mesin wheel loader dengan pendekatan Reliability Centered Maintenance di PT. Swadaya Graha,” JUSTI (Jurnal Sistem dan Teknik Industri), vol. 2, no. 1, pp. 119–130, 2021.
A. J. Wardana and M. Abdulrahim, “Strategi meningkatkan keandalan mesin reader untuk memperpendek antrian pada Gate 7 Gerbang Waru Ramp,” Innov. J. Soc. Sci. Res., vol. 4, no. 3, pp. 5981–6000, 2024. [Online]. Available: https://j-innovative.org/index.php/Innovative
B. Habeahan, H. V. Gea, and R. R. Margana, “Analisis efektivitas penerapan preventive maintenance menggunakan Mean Time Between Failures dan Mean Time to Repair terhadap kinerja operasional forklift di PT XYZ,” J. Log. Logist. Supply Chain Cent., vol. 4, no. 2, pp. 61–66, 2026. [Online]. Available: https://doi.org/10.33197/jlscc.v4i2.3401
G. S. Gandara, N. E. A. Jantra, and R. S. Sukandar, “Usulan penjadwalan preventive maintenance pada mesin overhead crane dengan menggunakan metode keandalan dan FMEA di PT Korindo Heavy Industry,” J. Ilm. Tek. dan Manaj. Ind., vol. 4, no. 1, pp. 78–95, 2024.
H. Ariyah, “Penerapan metode Overall Equipment Effectiveness (OEE) dalam peningkatan efisiensi mesin batching plant (studi kasus: PT. Lutvindo Wijaya Perkasa),” J. Teknol. dan Manaj. Ind. Terap., vol. 1, no. 2, pp. 70–77, 2022.
Downloads
Published
How to Cite
Issue
Section
Categories
License
Copyright (c) 2026 Mohammad Nabil Makarim, Tedjo Sukmono

This work is licensed under a Creative Commons Attribution 4.0 International License.