Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit train using the Lean Manufacturing

Analisis Pemborosan dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing

Authors

  • Muhammad Fajar Ramadhani Prodi Teknik Mesin, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo
  • Iswanto Prodi Teknik Mesin, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/gs7vsc05

Keywords:

Lean manufacturing, Underframe propulsion, Seven waste, 5S, Kaizen

Abstract

General Background: The rail transportation sector plays a vital strategic role in mass mobility, logistics distribution, and economic growth. Specific Background: Fleet rehabilitation projects, such as the KCI-Retrofit commuter train program, require stringent dimensional accuracy and high-quality standards during underframe assembly. Knowledge Gap: Despite its importance, retrofit assembly lines frequently experience operational inefficiencies and severe workflow bottlenecks due to material degradation and integration challenges between legacy structures and new components. Aims: This study aims to identify and minimize critical manufacturing wastes within the underframe propulsion installation process using a comprehensive Lean Manufacturing framework. Results: The evaluation indicates that waiting, defects, and excessive motion constitute the primary operational wastes, driven by delayed material deliveries, component mismatches, uncoordinated design revisions, and suboptimal layouts. Novelty: This research introduces an integrated improvement methodology combining Value Stream Mapping, Seven Waste analysis, Fishbone diagnostics, 5S implementation, and Kaizen continuous improvement to optimize retrofit assembly line performance. Implications: The proposed interventions successfully streamline material flow, reduce non-value-added activities, and enhance overall productivity and assembly quality within the railway retrofit sector.

Key Findings Highlights

  1. Waiting, defects, and motion represent the three most critical categories of waste affecting underframe propulsion assembly operations,

  2. Inefficiencies stem primarily from delayed component arrivals, uncoordinated design modifications, and improper workplace organization,

  3. The integrated application of 5S and Kaizen methods effectively optimizes process flows and enhances structural installation quality.

Keywords Lean manufacturing, Underframe propulsion, Seven waste, 5S, Kaizen

References

Mughni, "Penaksiran Waste Pada Proses Produksi Sepatu Dengan Waste Relationship," Skripsi, Universitas Islam Indonesia, 2005.

R. D. Herwindo, U. Ciptomulyono, and M. Y. Anshori, "Implementasi Lean Manufacturing Car Body Studi Kasus di PT Inka (Persero)," Prosiding Seminar Nasional Manajemen Teknologi VII, pp. 131–144, 2008.

H. Erinofiardi, "Analisa Defleksi Struktur Tower Transmisi Menggunakan Metode Elemen Hingga," Jurnal Rekayasa Mesin, vol. 3, no. 2, pp. 362–371, 2012.

P. Monitoring, I. Pengolahan, and A. Limbah, "Prototype Monitoring and Controlling of Wastewater Treatment Plant (WWTP) on IoT-Free Output Channels," Journal of Automation and Control, vol. 7, no. 1, pp. 12–19, 2023.

Magnesium, Y. Zhang, and Z. Zhou, "Characteristics of Galvanized, Graphene Oxide and Aluminum Waste Powder for Coating on Medium Carbon Steel," Materials Research Express, vol. 9, no. 4, pp. 45–52, 2022.

S. Raihan, A. Abiyyu, and E. Setiawan, "Analisis Network Diagram Dengan Metode CPM Dan PERT Pada Project Pekerjaan Pemasangan Komponen Kelistrikan Kereta Listrik Makasar Pare-Pare," Jurnal Transportasi dan Logistik, vol. 6, no. 2, pp. 98–108, 2023.

P. Untuk, M. Makespan, and D. A. N. Biaya, "Optimasi Multi-Obyektif NSGA-II Pada Penjadwalan Produksi," Jurnal Optimasi Sistem Industri, vol. 23, no. 1, pp. 45–58, 2024.

J. Timur, "Jurnal SENOPATI: Information Systems, Information Technology and Computer Engineering," vol. 5, no. 2, pp. 86–99, 2024.

R. Firdaus, Iswanto, Mulyadi, and M. N. Rizki, "Pengaruh Parameter Proses Friction Stir Welding Dengan Material Aluminium Alloy AA6061-T651 Terhadap Distorsi dan Uji Kekerasan," Jurnal Rekayasa Mesin, vol. 11, no. 2, pp. 169–176, 2022.

S. Id, "Effect of Welding Using Electrodes with Certain Treatment," International Journal of Welding Technology, vol. 12, no. 1, pp. 33–40, 2021.

J. T. Mesin and P. N. Jakarta, "Analisis Overall Equipment Effectiveness (OEE) Sebagai Dasar Perbaikan Lini Perakitan Frame Chasis di PT. X," Jurnal Ilmiah Teknik Mesin, vol. 2, no. 1, pp. 263–273, 2019.

M. Agam, Iswanto, and I. Muslim, "Pengaruh Parameter Pengelasan Pada Friction Stir Welding Terhadap Sifat Mekanik Polimer Jenis Polyethylene," Jurnal Dinamika Vokasional Teknik Mesin, vol. 4, no. 1, pp. 1–9, 2019.

S. Hartini, S. Saptadi, N. Kadarina, and I. Rizkya, "Implementasi Lean Manufacturing untuk Minimasi Waste (Studi Kasus PT ‘X’ Indonesia)," Jurnal Teknik Industri, vol. 4, no. 2, pp. 95–105, 2009.

R. Lukita, "Analisis Sistem Manufaktur di Politeknik Negeri Jakarta," Laporan Politeknik Negeri Jakarta, 2024.

E. Rb-, M. Rizky, Iswanto, and F. Dermawan, "Analysis of Weld Joint Strength on Galvanized Material Using Rb-26 Electrode Analisis Kekuatan Sambungan Las Pada Material Galvanis Menggunakan," Jurnal Rekayasa Mesin, vol. 7, no. 3, pp. 295–299, 2024.

D. S. Purwohadi, Mulyadi, and Iswanto, "Pengaruh Variasi Waktu dan Jumlah Lapisan Fiberglass dalam Proses Pembuatan Material Komposit Terhadap Kekuatan Tarik, Tekuk dan Kerataan Permukaan," Jurnal Mekanika, vol. 10, no. 1, pp. 45–52, 2025.

Downloads

Published

2026-11-18

How to Cite

[1]
“Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit train using the Lean Manufacturing : Analisis Pemborosan dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing ”, PELS, vol. 10, no. 1, pp. 3058–3065, Nov. 2026, doi: 10.21070/gs7vsc05.

Most read articles by the same author(s)