Laporan Praktikum Bear Modular Chair Factory Layout

Layout Pabrik Kursi Modular Beruang

Authors

  • Agustinus Almeida Soares Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Lambang Akbar Ramadhan Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Muhammad Yazid Albusthomi Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Muhammad Wahyu Setya K Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Atikha Sidhi Cahyana Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/hnswh145

Keywords:

Facility layout design, Material handling, Blocplan, Layout

Abstract

General Background: Facility layout planning represents a crucial operational element that directly determines manufacturing efficiency and resource utilization within industrial systems. Specific Background: This study analyzes the application of facility layout planning in the production process of Modular Bear Chairs to streamline material flow and minimize material handling costs. Knowledge Gap: Inefficient initial layouts frequently trigger unnecessary material movement and elevated operational costs due to non-sequential department arrangements. Aims: This research aims to identify departmental relationships using the Activity Relationship Chart and Activity Relationship Diagram, analyze material flow through the From-to-Chart method, and develop optimal facility layouts using BLOCPLAN software. Results: Out of ten generated layout alternatives, the BLOCPLAN algorithm identified the best configuration yielding an adjusted score of 0.97 and a relationship-distance score of 0.76. Novelty: This work integrates qualitative relationship charts with quantitative BLOCPLAN algorithmic iterations to redesign furniture manufacturing layouts. Implications: The selected layout significantly minimizes material transfer distances and improves overall production process effectiveness.

Key Findings Highlights

  1. Initial production layouts demonstrated inefficiencies due to non-sequential departmental placement.

  2. The BLOCPLAN software generated ten layout alternatives, selecting an optimal configuration with an adjusted score of 0.97.

  3. The proposed layout successfully reduced material handling movement and optimized overall production process efficiency.

Keywords Facility layout design, Material handling, Blocplan, Layout

References

Muhammad Yaswinudin and Dwi Agus Susila, “Perancangan Kursi Teras Kayu Jati Dengan Ide Dasar Puzzle”, J. Sci. Res. Dev., vol. 6, no. 1, pp. 1366–1375, 2024. doi: 10.56670/jsrd.v6i1.434.

M. R. Adamhuri and K. Puddin, “Pengaruh Kualitas Produk dan Desain Produk terhadap Volume Penjualan pada UD . Sinar Arafah Jaya di Deli Serdang,” 2025.

L. Lestari and W. Wahyudin, “Analisis Kelayakan Bisnis pada Perancangan dan Pengembangan Produk Kursi Multifungsi”, Performa Media Ilm. Tek. Ind., vol. 21, no. 1, p. 86, 2022. doi: 10.20961/performa.21.1.58401.

R. E. Putri and W. Ismanto, "Pengaruh Perancangan Ulang Tata Letak Fasilitas di Area Operasional Kerja Berbasis 5S untuk Pengajuan Modal Usaha", Dimensi, vol. 8, no. 1, pp. 71–89, 2022.

F. Azima, Z. Arifin, and V. E. Afma, "Perancangan Ulang Tata Letak Pabrik Menggunakan Metode Systematic Layout Planning Guna Meningkatkan Output Produksi pada PT. Wahana Tirta Milenia Batam", Profisiensi, vol. 8, no. 1, pp. 23–35, 2022.

H. Habibi, V. E. Afma, and Z. Arifin, "Perancangan Ulang Tata Letak Fasilitas Produksi dengan Menggunakan Metode Diagram Alir Bersegitiga untuk Meminimasi Jarak Material Handling di PT. AT Oceanic Offshore", Profisiensi, vol. 3, no. 2, pp. 127–137, 2021.

J. Immanuel, Amelia Santoso, and Markus Hartono, “Analisis perancangan tata letak fasilitas di perusahaan XYZ produksi kedelai dengan systematic layout planning”, JENIUS J. Terap. Tek. Ind., vol. 4, no. 2, pp. 250–261, 2023. doi: 10.37373/jenius.v4i2.555.

D. A. Sumarto, A. Zaini, R. Mildani, and R. Hardian, “Penerapan Prinsip Modular Design Untuk Hunian Terjangkau Di Perkotaan Banda Aceh 2023 Implementation Of Modular Design Principles For Affordable Housing In Banda Aceh Urban 2023”, vol. 9, no. 2, 2023.

G. Mohammad, U. Islam, N. Ulama, and A. R. Chart, “Usulan Perbaikan Tata Letak Fasilitas Area”, vol. 1, no. 1, pp. 22–29, 2023.

Y. Suryana and M. Hilman, “Intriga : Info Teknik Industri Galuh Jurnal Mahasiswa Teknik In Dustri Bina Netral Garuda Jaya Kabupaten Ciamis”, Intriga Info Tek. Ind. GALUH J. Mhs. Tek. Indust ri, vol. 2, no. 1, pp. 71–80, 2024.

Karisma and Y. Arifatul Fatimah, “Literature Review : Teknik Perancangan Tata Letak Fasilitas Gudang Pada Perushaan Manufaktur Yang Efisien”, Borobudur Eng. Rev., vol. 2, no. 1, pp. 12–22, 2022. doi: 10.31603/benr.6300.

I. Arbi and H. Rendra, “Perancangan Tata Letak Fasilitas Lantai Produksi pada Pembuatan Sepatu dengan Menggunakan Metode Systematic Layout Planning CV. Sinar Persada Karyatama”, IKRAITH-Teknologi, vol. 6, no. 3, pp. 38–52, 2022. doi: 10.37817/ikraith-teknologi.v6i3.2305.

Mashabai Ismi, Adiasa Iksan, and Ardiansyah Syahrul, “1021-Article Text-2812-1-10-20210415 (4)”, JurnalIndustri&TeknologiSamawa, vol. 2, no. 1, pp. 32–37, 2021.

M. H. A. Shiddiqi, E. Ismiyah, and Y. P. Negoro, “Proposed Improvements to Production Facility Layout Using ARC and ARD at Home Industry Aurora Official”, G-Tech J. Teknol. Terap., vol. 9, no. 1, pp. 482–490, 2025. doi: 10.70609/gtech.v9i1.6219.

Akmal, D. Lantara, and M. Dahlan, “Redesign Tata Letak Fasilitas pada Pabrik Produksi Beras dengan Metode Activity Relationship Diagram pada Ud. Cahaya Indah”, JAPSI J. Apl. dan Pengemb. Sist. Ind., vol. 3, no. 2, pp. 74–82, 2025.

W. Gunawan and H. Haerulloh, “Usulan Tata Letak Fasilitas Kampus 1 Universitas Banten Jaya Dengan Menggunakan Metode ARC dan ARD”, J. InTent, vol. 4, no. 2, pp. 168–185, 2021.

F. Laoh, I. H. Lahay, and J. Darusalam, “JUTIN : Jurnal Teknik Industri Terintegrasi Perancangan Ulang (Re-Layout) Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning (SLP) dan Algoritma BLOCPLAN”, JUTIN J. Tek. Ind. Terintegrasi, vol. 8, no. 1, pp. 1049–1059, 2025.

R. Abdillah and R. A. Darajatun, “Penanganan Bahan (Material Handling) Terhadap Pembuatan Part Bracket Roof Rail A dengan Menggunakan Metode General Analysis di PT Ichii Industries Indonesia”, J. Ilm. Wahana Pendidik., vol. 8, no. 3, p. 43, 2022. doi: 10.5281/zenodo.6301663.

D. Taufiqulhakim and L. Fitria, “Usulan Perancangan Layout Pertashop Dengan Metode BLOCPLAN di PT. Torio”, Pros. Disem. Fak. Teknol. Ind., vol. 1, no. 1, pp. 1–11, 2022.

Yustian Suhandinata, “Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode From-to-Chart pada Perusahaan Meubel di CV. Esa Banyuwangi”, J. Sipil Terap., vol. 1, no. 1, pp. 192–221, 2023. doi: 10.58169/jusit.v1i1.602.

M. Maulidah, P. Anggela, and I. Sujana, “Redesign Tata Letak Fasilitas Menggunakan Metode Activity Relationship Chart dan Algoritma BLOCPLAN Pada Pabrik Xyz”, J. Tek. Ind. Univ. Tanjungpura, vol. 6, no. 2, pp. 78–82, 2022.

Pamungkas, Abdiel Khaleil Akmal, and Heri Tri Irawan, “BLOCPLAN Algorithm for Facility Layout Design in Various Industry in Indonesia”, J. Inotera, vol. 9, no. 1, pp. 212–219, 2024. doi: 10.31572/inotera.vol9.iss1.2024.id327.

E. V. Tandilino, D. Widada, and F. D. Sitania, “(Journal of Industrial and Manufacture Engineering)”, JIME (Journal Ind. Manuf. Eng.), vol. 5, no. 1, pp. 30–40, 2023.

C. Online and S. Nurmutia, “Perencanaan Tata Letak Penanganan Material Gudang Menggunakan Metode Bagan Hubungan Aktivitas dan BLOCPLAN 90,” vol. 11, no. 2, pp. 373–378, 2024.

Downloads

Published

2026-11-18

How to Cite

[1]
“Laporan Praktikum Bear Modular Chair Factory Layout: Layout Pabrik Kursi Modular Beruang”, PELS, vol. 10, no. 1, pp. 3095–3104, Nov. 2026, doi: 10.21070/hnswh145.

Most read articles by the same author(s)

1 2 3 > >>