Mickey Mouse Modular Chair Factory Layout Design

Perancangan Tata Letak Pabrik Kursi Modular Mickey Mouse

Authors

  • Radan Ghaly All Fawwas Universitas Muhammadiyah Sidoarjo.
  • Erlangga Nur S Universitas Muhammadiyah Sidoarjo
  • Zarir Adiyatma Surya Muhammad Universitas Muhammadiyah Sidoarjo
  • Mochamad Fariz Prayoga Universitas Muhammadiyah Sidoarjo
  • Atikha Sidhi Cahyana Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/fwex4111

Keywords:

Facility layout design, Modular chair, Material handling, From-To Chart, Blocplan

Abstract

General Background: Companies must create effective manufacturing processes, particularly in the layout of production plants, in order to grow the furniture business. Specific Background: Inappropriate facility design can lead to needless travel distances, ineffective material flow, and higher material handling expenditures during the production of Mickey Mouse modular chairs. Knowledge Gap: Sequential and interdependent manufacturing processes require frequent material movement among departments, necessitating structured layout planning. Aims: This work aims to create a process-oriented production facility design that is effective, safe, and reduces material handling expenditures as well as distances. Results: The original arrangement results in a total material handling volume of 1,530 units with a total material handling cost of Rp4,027,782, whereas the suggested Blocplan layout successfully decreases material handling distance, cuts expenses, and reduces time. Novelty: This study integrates MPPC, ARC, ARD, From-To Chart, and Blocplan methodology to optimize modular furniture facility arrangements. Implications: The proposed facility layout improves overall operational efficiency, safety, and production flow continuity.

Key Findings Highlights

  1. The initial plant layout generates a material handling volume of 1,530 units with total costs reaching Rp4,027,782.

  2. The Blocplan methodology generates and evaluates alternative facility arrangements to optimize spatial distribution.

  3. The proposed layout configuration successfully minimizes material transfer distance, reduces handling expenses, and streamlines production processes.

Keywords Facility layout design, Modular chair, Material handling, From-To Chart, Blocplan

References

M. A. Novianto, S. S. Hervanda, M. D. Zakaria, R. Bamban, and Jakaria, “Perancangan Kursi Santai Menggunakan Metode Pahl and Beitz,” J. Multidisiplin Saintek, vol. 4, no. 2, 2024.

Wijaya, K. Mustaqim, F. Desain, I. Kreatif, U. Esa, and K. Jeruk, “Perancangan Furnitur Kursi Tamu Dari Limbah Kayu Dan Limbah Kayu Palet,” JCA Des. Creat., vol. 1, no. 1, pp. 21–29, 2021.

M. L. Pattiapon and N. E. Maitimu, “Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Menggunakan Metode Algoritma Blocplan Guna Meminimasi Ongkos Material Handling,” J. Artic., vol. 15, no. 2, 2021.

M. L. Pattiapon and N. E. Maitimu, “Perancangan Ulang Tata Letak Fasilitas Produksi Menggunakan Metode Craft Guna Efisiensi Jarak Dan Biaya Material Handling Pada Lantai Produksi CV. X,” J. Artic., vol. 19, no. 02, 2025.

M. M. Arifin, M. Agustin, D. Elok, and V. Lusia, “Perancangan Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning Pada Produksi Komponen Wiring Harness,” J. Penelit. dan Apl. Sist. dan Tek. Ind., vol. 19, no. 2, pp. 185–199, 2025.

O. Ramdhani and M. Jufriyanto, “Analisis Efisiensi Tata Letak Fasilitas Produksi Herbisida PT XYZ Menggunakan Integrasi Metode FTC Dan ARC Analysis,” J. Inf. Technol. Comput. Sci., vol. 8, no. 5, pp. 1710–1715, 2025.

Karisma and Y. Arifatul Fatimah, “Teknik Perancangan Tata Letak Fasilitas Gudang Pada Perusahaan Manufaktur Yang Efisien,” Borobudur Eng. Rev., vol. 2, no. 1, pp. 12–22, 2022. doi: 10.31603/benr.6300.

S. Purba, S. Sihombing, and P. T. Parhusip, “Analisis Tata Letak Fasilitas Produksi Pada Pabrik Tahu Anugerah Cipta Nusantara Di Kecamatan Medan Selayang Medan,” J. Manaj. Dan Bisnis, vol. 23, no. 1, pp. 45–64, 2023.

W. A. Putri, Astalini, and Darmaji, “Analisis Kegiatan Praktikum untuk Dapat Meningkatkan Keterampilan Proses Sains dan Kemampuan Berpikir Kritis,” J. Ilmu Pendidik., vol. 4, no. 3, pp. 3361–3368, 2022.

M. N. Affiyanti, A. T. Purwandari, and A. J. Pratama, “Perancangan SOP dan Tata Letak Lantai Produksi Pada LCC Respira V.01 PAPR (Powered Air Purifying Respirator),” J. Al-Azhar Indones. Seri Sains dan Teknol., vol. 6, no. 1, pp. 43–56, 2021.

Sugiyono, Buku Ajar Perencanaan Tata Letak Fasilitas, 2018.

S. Z. Nisa and W. Setiafindari, “Perancangan Ulang Tata Letak Fasilitas Untuk Meminimalkan Jarak Material Handling Menggunakan Algoritma CORELAP,” J. Teknol. dan Manaj. Ind. Terap., vol. 2, no. 4, pp. 250–260, 2023.

Rozak, D. Kristanto, G. S. Raharjo, and A. Saleh, “Penerapan ARC dan ARD untuk Membuat Rancangan Layout Fasilitas pada Pabrik Kerupuk Menggunakan BLOCPLAN Di CV Arto Moro,” Bull. Appl. Ind. Eng. Theory, vol. 2, no. 2, pp. 145–149, 2021.

Arianto, Perancangan Tata Letak Fasilitas dan Aplikasinya, 2023.

Adhitya, P. A. W. Mustri, H. Afansya, and Budiharjo, “Analisis Efektivitas Tata Letak Pada Proses Produksi Menggunakan Metode ARC (Activity Relation Chart) Dan Penerapan Software Blocplan Di PT Bataguna Jaya Mandiri,” J. Multidisiplin, vol. 10, no. 6, 2025.

M. Zainal, N. Hafid, and R. Septiari, “Penjadwalan Produksi Pada Pengolahan Limbah Plastik Dengan Metode Master Production Schedule,” J. Valtech (Jurnal Mhs. Tek. Ind.), vol. 7, no. 1, pp. 215–224, 2024.

Downloads

Published

2026-11-18

How to Cite

[1]
“Mickey Mouse Modular Chair Factory Layout Design: Perancangan Tata Letak Pabrik Kursi Modular Mickey Mouse”, PELS, vol. 10, no. 1, pp. 3118–3126, Nov. 2026, doi: 10.21070/fwex4111.

Most read articles by the same author(s)

1 2 3 > >>