Work Productivity Analysis Using the Work Sampling Method on Crane Operators at Sugar Factory
Analisis Produktivitas Kerja Menggunakan Metode Work Sampling pada Operator Crane Pabrik Gula
DOI:
https://doi.org/10.21070/6c6z9a49Keywords:
Productivity Analysis, Work Sampling, Standard Time, Sugar IndustryAbstract
General Background: Sugar manufacturing serves as a strategic industrial sector in national food security, where production continuity depends heavily on material handling efficiency. Specific Background: Crane operators play a vital role in maintaining material flows across sugar factory workstations, yet performance variations often introduce operational delays and productivity losses. Knowledge Gap: Prior facility assessments frequently lack structured work measurement frameworks to quantify productive proportions, idle time, and operator workload disparities under actual factory operating conditions. Aims: This research evaluates the productivity performance of crane operators at a sugar factory using the work sampling method. Results: Periodic observations over a twelve-day period indicate that the first operator achieved a productivity level of 59%, while the second operator recorded 72%, with differences attributed to workload distribution, waiting duration, and equipment operation efficiency. Novelty: This study establishes an empirical work sampling and standard time evaluation model specifically designed for heavy material handling operations in sugar manufacturing plants. Implications: Implementing workflow improvements and workload balancing based on these findings enables industrial management to elevate crane operational effectiveness and overall production efficiency.
Key Findings Highlights
- Work sampling observations over 12 days reveal that crane operators achieve productivity levels ranging between 59% and 73% during material handling operations.
- Statistical control limit evaluations confirm that operational productivity data remain within acceptable control bounds despite variations in worker idle time.
- Standard time and work allowance calculations demonstrate that higher operator productivity directly correlates with more efficient task execution and reduced operational downtime.
Keywords Productivity Analysis, Work Sampling, Standard Time, Sugar Industry
References
W. Widhianingsih and H. C. Wahyuni, “Strategi Peningkatan Kualitas Sepatu dengan Metode Failure Mode and Effect Analysis, Grey Relational Analysis, dan Root Cause Analysis,” Jurnal Rekayasa Sistem Industri, no. 3, pp. 1–17, 2024.
D. T. Cahyaningrum, A. Amaranthine, S. Putri, and D. Lestari, “Analisis Produktivitas Tenaga Kerja dengan Metode Produktivitas Parsial (Bagian Pengemasan Unit Usaha Lain PDP Kahyangan Jember),” Jurnal Ilmiah Mahasiswa Agroinfo Galuh, vol. 2, no. 1, pp. 36–40, 2022, doi: 10.25047/jmaa.v2i1.24.
M. Desfita and F. Hamid, “Work Sampling Methods dalam Analisis Produktivitas Tenaga Kerja Kontruksi Proyek Pembangunan Gedung (Studi Kasus: Proyek Pembangunan Gedung Kuliah Baiturrahmah),” Jurnal Teknologi Dan Sistem Informasi Bisnis, vol. 3, no. 1, pp. 259–266, 2021.
D. H. M. Hasibuan, Manajemen Sumber Daya Manusia. Jakarta, Indonesia: Bumi Aksara, 2005.
S. Endah and D. M, “Pengukuran Waktu Baku dan Analisis Beban Kerja pada Proses Filling dan Packing Produk Lulur,” Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi, vol. 2, pp. 51–61, 2020.
A. Sulaiman, Y. Sulaeman, N. Mustikasari, D. Nursyamsi, and A. M. Syakir, “Increasing Sugar Production in Indonesia through Land Suitability Analysis and Sugar Mill Restructuring,” Agrivita, pp. 1–17, 2020.
T. Danel, Z. Lafhaj, A. Puppala, S. Lienard, and P. Richard, “Proposal for Tower Crane Productivity Indicators Based on Data Analysis in the Era of Construction 4.0,” Automation in Construction, pp. 1–15, 2021.
M. Yasin, A. F. Nia, and M. A. Munanda, “Analisis Efisiensi Waktu Kerja dan Kinerja SDM pada Proses Skiving di Industri Mebel Skala Kecil,” Jurnal Manajemen Rekayasa dan Inovasi Bisnis, vol. 4, no. 1, 2025.
Satria, N. Wibowo, A. N. Aisha, F. R. Industri, and U. Telkom, “Perencanaan Kebutuhan Sumber Daya Manusia pada Stasiun Kerja Penjahitan UKM Esgotado Menggunakan Metode Work Sampling,” e-Proceeding of Engineering, vol. 7, no. 3, pp. 9616–9624, 2020.
R. Anggraini, S. Laorenza, and M. I. Adelino, “Analisis Pengukuran Waktu Kerja Secara Langsung dengan Metode Work Sampling pada UMKM Soerabi Bandung,” Jurnal Sains dan Teknologi, vol. 3, no. 1, pp. 151–157, 2023, doi: 10.47233/jsit.v3i1.519.
N. H. Pattiasina, P. Markus, and S. R. R. Pattiselanno, “Kajian Antropometri Pengrajin Tenun Ikat Khas Maluku,” Jurnal Simetrik, vol. 11, no. 2, pp. 495–503, 2022, doi: 10.31959/js.v11i2.849.
W. Widhianingsih and H. C. Wahyuni, “Peningkatan Produktivitas Sepatu melalui Pengendalian Persediaan Bahan Baku dengan Metode Economic Order Quantity (EOQ) (Studi Kasus: CV Yunanda, Sidoarjo),” Jurnal Optimasi Teknik Industri, pp. 32–38, 2023.
Firda, Hanafiah, and Akhirini, “Produktivitas Pekerja dengan Menggunakan Metode Work Sampling,” Jurnal Teknik Industri, vol. 1, no. 1, pp. 15–25, 2023.
F. M. Hardiansyah and B. I. Putra, “Workload Analysis Using Work Sampling and NASA-TLX to Determine the Number of Work Caging Part Operators,” Journal of Industrial Engineering, pp. 1–4, 2023.
R. Anggraini, S. Laorenza, and M. I. Adelino, “Analisis Pengukuran Waktu Kerja Secara Langsung dengan Metode Work Sampling pada UMKM Soerabi Bandung,” Jurnal Sains dan Teknologi, vol. 3, no. 1, pp. 1–7, 2023.
M. Nevenda, L. Mei, C. Wulandari, U. Katolik, and D. Cendika, “Analisis Perhitungan Waktu Standart untuk Menentukan Jumlah Tenaga Kerja Optimal pada Proses Produksi PT. NRZ Prima Gasket,” Satukata, vol. 1, no. 5, pp. 211–222, 2023.
F. Agustin, S. Sinaga, K. Hadi, R. D. Putra, and I. B. Nova, “Menghitung Kegiatan Waktu Produktif dengan Metode Work Sampling,” Jurnal Rekayasa Sistem, vol. 4, no. 1, 2023.
I. Putra, I. A. S. W, and R. B. Jakaria, “Worksampling sebagai Usaha Mengukur Produktivitas Perakitan Kursi Model Praktikum Analisa Perancangan Sistem Kerja dan Ergonomi,” Jurnal Ergonomi dan K3, vol. 4, no. 2, pp. 61–69, 2022.
P. Y. M. Sitorus, “Analisis Penerapan Metode Work Sampling dalam Meningkatkan Produktivitas Karyawan di PT Pagira,” Jurnal Ilmiah Manajemen, vol. 7, no. 2, pp. 38–43, 2024.
S. Wignjosoebroto, Ergonomi Studi Gerak dan Waktu. Surabaya, Indonesia: Guna Widya, 2006.
M. Rahayu, “Pengukuran Waktu Baku Perakitan Pena dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja,” Jurnal Performa, vol. 7, no. 2, 2020.
Sutiko, H. Suprapto, and D. Zainuddin, “Analisis Produktivitas dan Beban Kerja Operator Produksi dengan Metode Work Sampling dan NASA-TLX di PT. Tokai Dharma Indonesia Plant II,” Jurnal Optimasi Teknik Industri, pp. 49–55, 2021.
Hermanto and Widiyarini, “Analisis Beban Kerja dengan Metode Workload Analysis (WLA) dalam Menentukan Jumlah Tenaga Kerja Optimal di PT Indojt,” Performa: Media Ilmiah Teknik Industri, vol. 19, no. 2, pp. 247–256, 2020, doi: 10.20961/performa.19.2.46467.