Tayo Bus Modular Chair Factory Layout Design
Perancangan Tata Letak Pabrik Kursi Modular Bus Tayo
DOI:
https://doi.org/10.21070/pbvw4547Keywords:
Modular Chair, Material Handling, Arc, From to Chart, BlocplanAbstract
General Background: Facility layout design represents a critical operational mechanism in manufacturing industries to streamline internal workflows and optimize facility organization. Specific Background: Manufacturing facilities frequently encounter long material transfer distances and poorly structured production layouts that hinder productivity and inflate handling costs. Knowledge Gap: Traditional initial factory floor configurations often lack integrated qualitative and quantitative evaluations combining routing analyses with automated layout generation tools. Aims: This study designs an optimal production facility layout at the Tayo Modular Bus Seat Factory to enhance material flow efficiency and reduce material handling costs. Results: Utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), From-To Chart, and Blocplan algorithm, the analysis indicates a total initial material transfer volume of 2,310 units with costs reaching Rp2,342,937, successfully yielding an optimized layout alternative with a top adjusted adjacency score of 0.92. Novelty: This research establishes an integrated layout planning framework combining MPPC, ARC, ARD, From-To Chart, and Blocplan algorithms specifically tailored for modular wooden chair assembly lines. Implications: Implementing this optimized layout configuration enables industrial managers to significantly improve departmental proximity, shorten transfer distances, and elevate overall manufacturing productivity.
Key Findings Highlights
- The initial From-To Chart evaluation reveals a total material transfer volume of 2,310 units resulting in cumulative material handling costs of Rp2,342,937.
- Blocplan algorithm simulation generates ten layout alternatives, identifying layout option number one as the optimal design with an adjusted evaluation score of 0.92.
- The proposed facility redesign successfully improves interdepartmental proximity and shortens material transport distances to ensure smooth modular chair production workflows.
Keywords Modular Chair, Material Handling, Arc, From to Chart, Blocplan
References
Wijaya, K. Mustaqim, F. Desain, I. Kreatif, U. Esa, and K. Jeruk, “Perancangan Furnitur Kursi Tamu dari Limbah Kayu dan Limbah Kayu Palet,” Jurnal Desain Kreatif, vol. 1, pp. 21–29, 2021.
P. S. Purba and S. Sihombing, “Analisis Tata Letak Fasilitas Produksi pada Pabrik Tahu Anugerah Cipta Nusantara di Kecamatan Medan Selayang Medan,” Jurnal Rekayasa Industri, vol. 23, pp. 45–64, 2023.
J. Terapan, T. Industri, J. Immanuel, A. Santoso, and M. Hartono, “Analisis Perancangan Tata Letak Fasilitas di Perusahaan XYZ Produksi Kedelai dengan Systematic Layout Planning,” Jenius: Jurnal Ilmiah Teknik Industri, vol. 4, no. 2, pp. 250–261, 2023, doi: 10.37373/jenius.v4i2.555.
F. Amelia, A. H. Manurung, M. Anggraeni, and N. Maghvira, “Perancangan Ulang Tata Letak Fasilitas Melalui Metode Activity Relationship Chart (ARC) dan Activity Relationship Diagram (ARD),” Jurnal Optimasi Teknik Industri, vol. 3, no. 2, pp. 171–180, 2024.
Karisma and Y. A. Fatimah, “Literature Review: Teknik Perancangan Tata Letak Fasilitas Gudang pada Perusahaan Manufaktur yang Efisien,” Jurnal Logistik Indonesia, vol. 2, no. 1, pp. 12–22, 2022.
E. Hartari and D. Herwanto, “Perancangan Tata Letak Stasiun Kerja dengan Menggunakan Metode Systematic Layout Planning,” Jurnal Sistem Industri, vol. 5, no. 2, pp. 118–125, 2021.
S. Cahyani, E. Klarisa, I. Salcea, and R. H. Sinatrya, “Analisis Perancangan Tata Letak Ritel Abdidaya Mart dengan Metode Total Closseness Rating (TCR),” Jurnal Manajemen Ritel, vol. 16, pp. 81–86, 2023.
M. F. Mulyadi and T. Juniarto, “Perancangan Ulang Tata Letak Fasilitas Produksi pada Industri Mebel CV. Mutiara Jakabaring dengan Algoritma Blocplan,” in Prosiding Seminar Nasional Sekolah Tinggi Teknologi Dumai, vol. 1, no. 2, pp. 454–463, 2025.
E. Basuki, Z. Z. Alfieta, R. A. Apriani, D. Handayani, T. Industri, and U. I. Indonesia, Perencanaan Penjadwalan Produksi dengan Penerapan Forecasting dan Jadwal Induk Produksi untuk Produk Brake Drum Rear, vol. 6. Yogyakarta, Indonesia: Universitas Islam Indonesia, 2023.
Sugiyono, Buku Ajar Perencanaan Tata Letak Fasilitas (PTLF). Yogyakarta, Indonesia: Deepublish, 2018.
R. N. Lestari, “Pengaruh Material Handling dan Tata Letak Terhadap Efektivitas Produksi pada Perusahaan Manufaktur Otomotif di Kawasan Jababeka I Cikarang,” Jurnal Ilmiah Manufaktur, vol. 1, no. 2, pp. 69–79, 2021.
N. F. Azizah, R. A. Apriani, F. M. P, M. Z. Z. A, and F. Aji, “Analisis Perancangan Tata Letak Menggunakan Metode Activity Relationship Chart (ARC) dan Computerized Relationship Layout Planning (CORELAP) pada CV. Tunas Karya,” Jurnal Teknik Industri, vol. 9, no. 1, pp. 86–94, 2023.
P. L. Sholeha and A. Rahardian, “Perancangan Tata Letak Fasilitas Menggunakan Metode Blocplan Studi Kasus Toko Oleh-Oleh Surabaya Honest,” Jurnal Mahasiswa Teknik Industri, pp. 249–262, 2022.
N. H. I. Adiasa and Sartika, “Perancangan Tata Letak Fasilitas Gudang pada Proyek Pembangunan Jetty PLTMGU Lombok Peaker Menggunakan Metode Systematic Layout Planning (SLP) dengan Algoritma Blocplan,” Jurnal Rekayasa Sipil, vol. 5, no. 1, pp. 202–209, 2023.
S. U. Kholifah, “Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode Systematic Layout Planning dan BLOCPLAN untuk Meminimasi Biaya Material Handling pada UD. Sofi Garmen,” Jurnal Optimasi, vol. 7, no. 2, pp. 151–162, 2021.
S. M. Y. Putri, “Tata Letak Fasilitas Produksi pada PT. Blang Ketumba Menggunakan Metode Systematic Layout Planning dan Software Blocplan,” Jurnal Performa, vol. 2, no. 2, pp. 1–12, 2023.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Dwi Maulana, M. Arya Adi Pratama, Raihan Bagas Eka S.; Farichul Mukodam; Atikha Sidhi Cahyana

This work is licensed under a Creative Commons Attribution 4.0 International License.
