Crocodile Modular Chair Factory Layout
Layout Pabrik Kursi Modular Buaya
DOI:
https://doi.org/10.21070/me8mnv08Keywords:
Facility Layout Planning, Material Handling, ARC, Blocplan, Modular FurnitureAbstract
General Background Organized spatial arrangement of manufacturing facilities supports smooth operational workflows and controlled material movement across production stages. Specific Background Producing modular children’s chairs, such as the Crocodile Modular Chair, requires coordinated handling and sequential processing from raw material storage and measurement through cutting, sanding, drilling, painting, assembly, and finished goods storage. Knowledge Gap Practical layout studies combining qualitative closeness mapping, from-to material movement and cost tracking, and heuristic layout evaluation for modular children’s chair manufacturing remain limited. Aims This study analyzes and designs a production facility layout for Crocodile Modular Chair manufacturing using Multiple Product Process Chart, Activity Relationship Chart, Activity Relationship Diagram, From-To Chart, and BlocPlan. Results Layout alternative 9 recorded the highest adjacency score of 0.97 among evaluated alternatives while maintaining a solid relationship-distance score and comparable product movement, whereas total handling volume reached 2,737 with a total material handling cost of IDR 4,406,568 across linear department flows. Novelty This work evaluates facility layout alternatives through closeness mapping, from-to handling cost analysis, and BlocPlan scoring specifically for Crocodile Modular Chair fabrication. Implications Selecting layout 9 supports structured departmental arrangement and cost-aware material movement for modular chair production.
Key Findings Highlights-
Layout alternative nine achieved the highest adjacency score of zero point nine seven alongside a favorable relationship-distance score and no notable rise in product movement,
-
Total material handling volume reached two thousand seven hundred thirty-seven with a total handling cost of four million four hundred six thousand five hundred sixty-eight rupiah,
-
Highest closeness ratings occurred between linked sequential departments while unrelated functional areas received lower or restricted proximity ratings.
Facility layout planning, Material handling cost, Activity relationship chart, Blocplan evaluation, Modular children furniture
References
Ghofur, A. Zainudin, and Sutarya, “Desain Rocking Chair Untuk Taman Kanak-Kanak,” J. Suluh, vol. 6, no. 1, pp. 10–18, 2023.
D. Kusaeri, Sudarmono, and D. S. Arina, “Analisis Ergonomi Kursi Santai Multifungsi,” J. Tek. Komputer, Agroteknologi Dan Sains, vol. 1, no. 1, pp. 85–93, 2022.
Karisma and Y. A. Fatimah, “Literature Review: Teknik Perancangan Tata Letak Fasilitas Gudang Pada Perusahaan Manufaktur Yang Efisien,” Borobudur Eng. Rev., vol. 2, no. 1, pp. 12–22, 2022.
N. F. Azizah, R. A. Apriani, F. M. Pratama, M. Z. Zizo A, F. A. Pradana, and A. Azzam, “Analisis Perancangan Tata Letak Menggunakan Metode Activity Relationship Chart (ARC) dan Computerized Relationship Layout Planning (CORELAP),” J. Tek. Ind. J. Has. Penelit. dan Karya Ilm. dalam Bid. Tek. Ind., vol. 9, no. 1, p. 86, 2023.
J. Immanuel, A. Santoso, and M. Hartono, “Analisis Perancangan Tata Letak Fasilitas di Perusahaan XYZ Produksi Kedelai Dengan Systematic Layout Planning,” JENIUS J. Terap. Tek. Ind., vol. 4, no. 2, pp. 250–261, 2023.
Arianto, W. T. B. D. Yulianto, and Indramawan, Perancangan Tata Letak Fasilitas dan Aplikasinya, 1st ed. Jakarta Timur, Indonesia: Tim PS Teknik Industri Unsurya, 2023.
Angriani, N. Nurfina, M. Marisa, and S. Syafruddin, “Analisis Efisiensi Tata Letak Fasilitas Produksi PT. DEF,” J. Pesona Indonesia, vol. 2, no. 2, pp. 37–41, 2025.
Febriyanto and W. Setiafindari, “Optimasi Tata Letak Fasilitas Produksi dengan Metode Systematic Layout Planning (SLP) untuk Meningkatkan Efisiensi Material Handling,” J. Teknol. dan Manaj. Ind. Terap., vol. 4, no. 1, pp. 10–19, 2025.
Z. S. Nisam and W. Setiafindari, “Perancangan Ulang Tata Letak Fasilitas Untuk Meminimalkan Jarak Material Handling Menggunakan Algoritma CORELAP,” J. Teknol. dan Manaj. Ind. Terap., vol. 2, no. 4, pp. 250–260, 2023.
B. Aulia et al., “Analisis Tata Letak Fasilitas Toko Prima Freshmart SV IPB Melalui Metode Activity Relationship Chart (ARC) Dan Total Closeness Rating (TCR),” J. Teknol. dan Manaj. Ind. Terap., vol. 2, no. 2, pp. 128–134, 2023.
B. H. Yanto, R. Abimanyu, A. Fauzi, and N. Indriyani, “Tata Letak Fasilitas Pabrik Menggunakan Metode Systematic Layout,” IMTechno J. Ind. Manag. Technol., vol. 5, no. 2, pp. 53–60, 2024.
A. Rivaldi and Suseno, “Analisis Tata Letak Fasilitas Produksi Dengan Tujuan Mengurangi Biaya Penanganan Material Di Arthantra Batu Bata,” J. Ilm. Tek. Ind. Dan Inov., vol. 2, no. 2, pp. 1–12, 2024.
M. Malindzakova, P. Garaj, J. Trpčevská, and D. Malindzak, “Setting MRP Parameters and Optimizing the Production Planning Process,” Processes, vol. 10, no. 4, pp. 33–74, 2017.
J. Reis, “Exploring Applications and Practical Examples by Streamlining Material Requirements Planning (MRP) with Python,” Logistics, vol. 7, no. 4, 2023.
M. Maulidah, P. Anggela, and I. Sujana, “Redesign Tata Letak Fasilitas Menggunakan Metode Activity Relationship Chart Dan Algoritma BlocPlan Pada Pabrik XYZ,” J. Tek. Ind. Univ. Tanjungpura, vol. 6, no. 2, pp. 78–82, 2022.
Aristriyana and M. S. F. Ibnu, “Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode ARC Guna Memaksimalkan Produktivitas Kerja Pada UKM SB Jaya di Cisaga,” J. Ind. Galuh, vol. 5, no. 1, pp. 1–7, 2023.
H. B. A. Yanto, R. Abimayu, A. Fauzi, and N. Indriyani, “Tata Letak Fasilitas Pabrik Menggunakan Metode Systematic Layout Planning (SLP) Pada PT. Tesena Inovindo,” IMTechno J. Ind. Manag. Technol., vol. 5, no. 2, pp. 53–60, 2024.
Y. Suhandinata, “Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Metode From to Chart Pada Perusahaan Meubel di CV. Esa Banyuwangi,” J. Sipil Terap., vol. 1, no. 1, pp. 192–221, 2023.
M. Andriyanto and S. A. Cahyana, “Re-Layout Tata Letak Fasilitas Produksi Sepatu Menggunakan Metode Systematic Layout Planning dan BlocPlan,” J. Teknol. Terap., vol. 8, no. 1, pp. 186–195, 2024.
W. Mubarok, M. Sagaf, A. Syakhroni, and D. Prianjani, “Evaluasi dan Perbaikan Tata Letak Lantai Produksi Menggunakan Metode BlocPlan,” J. Teknol. dan Manaj. Ind. Terap., vol. 2, no. 2, 2025.
N. M. Wiati, K. Erliana, M. Rofieq, M. D. Prayogi, and M. R. Fauzy, “Metode Activity Relationship Chart (ARC) dan Software BlocPlan 90: dalam Upaya Pengurangan Jarak Material Handling pada CV. Egajaya,” J. PASTI (Penelitian dan Apl. Sist. dan Tek. Ind.), vol. 18, no. 1, p. 66, 2024.
K. Nurrahmat, I. Ruwana, and S. Indriani, “Perancangan Layout Fasilitas Produksi Dengan Metode Algoritma BlocPlan Untuk Mengoptimalkan Material Handling,” J. Valtech (Jurnal Mhs. Tek. Ind.), vol. 8, no. 2, pp. 480–487, 2025.
Downloads
Published
Issue
Section
Categories
License
Copyright (c) 2026 Muhammad Nafi'udin Eka Prawira, Riyadhus Ilhamsyahjati, Afitrah Dwi Rizkillah, Mochammad Rafi Alim Dwi Adhiansyah, Dani Arya Haryanto, Awwalinur Rosyid Hidayatulloh, Atikha Sidhi Cahyana

This work is licensed under a Creative Commons Attribution 4.0 International License.
