White Modular Chair Factory Layout

Layout Pabrik Kursi Modular Putih

Authors

  • Moch. Prama Farish Ariansyah Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Univeritas Muhammadiyah Sidoarjo
  • Ach. Rezza Nazaruddin Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Moch. Bakhrul Ulum Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Fajar Sulastri Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Moh. Sahka Alfarouq Program Studi Teknik Industri, Universitas Muhammadiyah Sidoarjo
  • Atikha Sidhi Cahyana Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/3dwesc85

Keywords:

Facility layout, Activity relationship chart, Multi-product process chart, Material handling, Heuristic layout

Abstract

General Background Facility layout planning organizes production workflows and material movement across departments to support continuous manufacturing operations and lower operational costs. Specific Background In modular furniture production, coordinating raw material storage, cutting, finishing, painting, and assembly requires structured process mapping and spatial arrangement for multi-component items. Knowledge Gap Applying combined qualitative relationship mapping, material flow matrices, and heuristic layout generation specifically to multi-part modular chair manufacturing requires empirical demonstration of departmental arrangement and handling cost figures. Aims This study presents the workflow sequence and factory layout design for a white modular chair using Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From To Chart, and BLOCPLAN. Results Actual machine requirements were recorded across departments, proximity relationships and handling volumes across seven departments totaled 2,934 with a total material handling cost of Rp 4,193,178, and layout 6 was selected among ten generated alternatives with a reported evaluation score of 0.97 (0.96 in the software table) and a relationship-distance score of 0.78. Novelty The paper integrates multi-component process mapping, closeness ratings, material flow costing, and heuristic layout evaluation tailored to a disassemble-capable modular chair. Implications The resulting layout provides a structured reference for organizing modular chair production lines and managing intra-factory material movement.

Key Findings Highlights
  1. Actual equipment counts were mapped across measurement, cutting, smoothing, assembly, and painting operations, with cutting requiring 29 grinders, smoothing requiring 12 finish grinders, and assembly requiring 4 drills

  2. Departmental material handling across the seven-stage workflow totaled 2,934 units with an overall handling cost of Rp 4,193,178, while proximity ratings established departmental adjacency priorities

  3. Among ten heuristic layout alternatives generated for the seven departments, layout 6 achieved the highest evaluation score and a relationship-distance score of 0.78, supporting sequential department placement

Keywords

Facility layout, Activity relationship chart, Multi-product process chart, Material handling, Heuristic layout

References

U. Prastyo, “Usulan Rancangan Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning pada Perusahaan XYZ,” Jurnal Trinistik, vol. 4, no. 2, pp. 1–10, 2025.

Ghozi, D. Hermanuadi, and K. Kunci, “Rancangan Tata Letak Fasilitas Produksi Tepung Mocaf Menggunakan Metode BLOCPLAN,” Jurnal Teknologi Pertanian Terapan, vol. 1, no. 1, pp. 39–48, 2023.

D. H. Pamungkas, “Optimisasi Systematic Layout Planning dan Perbandingan Work Sampling untuk Efisiensi Waktu Produksi di UD Cantenan,” Jurnal Kajian dan Penelitian Umum, vol. 3, no. 1, pp. 285–306, 2025.

Y. Ramadhan, “Perancangan Ulang Tata Letak Fasilitas Pabrik Menggunakan Metode BLOCPLAN CV. Tempe Suryadi Sentosa,” Jurnal Teknik Industri Terintegrasi, vol. 8, no. 3, pp. 1–10, 2025, doi: 10.31004/jutin.v8i3.46711.

A. Sibarani, Y. Syahrullah, D. T. Setyaningrum, and M. A. Prasetyo, “Usulan Tata Letak Fasilitas dengan Menggunakan Metode Systematic Layout Planning (SLP) pada Departemen Compound Industri Manufaktur Sepatu,” Jurnal Penelitian dan Aplikasi Sistem dan Teknik Industri, vol. 18, no. 3, pp. 353–366, 2024.

S. Saffanah, “Usulan Perancangan Tata Letak Lantai Produksi dengan SLP dan BLOCPLAN pada Produk Cutting Steel Pipe di CV. ABC di Cileungsi,” Jurnal Rekayasa Sistem Industri, vol. 8, no. 2, pp. 1–8, 2023.

S. Hartini, “Desain Tata Letak Gudang untuk Meminimalkan Ongkos Material Handling pada PT. Rotaryana Prima,” Jurnal eCo-Fin, vol. 5, no. 2, pp. 1–10, 2023, doi: 10.32877/ef.v4i1.454.

S. Syahruddin, P. Busandilo, A. Habsy, and H. Hermansyah, “Penerapan Metode Activity Relationship Chart (ARC) dalam Perencanaan Layout Perluasan Workshop di PT. EX-Jayapura,” Jurnal Alat Berat, vol. 2, no. 2, pp. 49–58, 2025.

Y. Halimsyah, R. Syara, and H. Wilujeng, “Evaluasi Layout Fasilitas Produksi Minyak Kelapa Sawit di PT. ABC dengan Metode Activity Relationship Chart (ARC) dan Activity Relationship Diagram,” Jurnal Green Engineering and Sustainability, vol. 1, no. 1, pp. 13–24, 2023.

A. Ayudya, “Perancangan From To Chart (FTC), Perhitungan BMO (Bahan, Mesin, Operator) dan Menggambar Mesin pada Lantai Produksi PT. XYZ,” Jurnal Talenta, vol. 7, no. 1, pp. 1–10, 2024, doi: 10.32734/ee.v7i1.2298.

Albertus, Perancangan Tata Letak Fasilitas, 1st ed. Batam, Indonesia: Yayasan Cendikia Mulia Mandiri, 2021.

J. A. Tompkins, J. A. White, Y. A. Bozer, and J. M. A. Tanchoco, Facilities Planning, 4th ed. Hoboken, NJ, USA: John Wiley & Sons, 2010.

M. N. Affiyanti et al., “Perancangan SOP dan Tata Letak Lantai Produksi pada LCC Respira V.01 PAPR (Powered Air Purifying Respirator),” Jurnal Al-Azhar Indonesia Seri Sains dan Teknologi, vol. 6, no. 1, pp. 43–56, 2021, doi: 10.36722/sst.v6i1.454.

M. I. Taufik, “Optimalisasi Tata Letak Produksi Menggunakan SLP untuk Efisiensi Ongkos Material Handling,” Jurnal Sains dan Teknologi, vol. 7, no. 2, pp. 383–393, 2025.

M. Febrianti, D. A. Azahra, A. Edward, R. F. Alamsyah, and M. Arkan, “Analisa Tata Letak Fasilitas Produksi dengan Metode ARC (Activity Relationship Chart) dan TCR (Total Closeness Rating) pada Chitalasa Coffee and Tea,” Jurnal Kolaboratif Sains, vol. 7, no. 11, pp. 4068–4078, 2024, doi: 10.56338/jks.v7i11.6351.

Y. Marbun, M. N. Awangsa, Q. Y. Chandra, and K. D. Syahira, “Analisis Layout Melalui Metode Activity Relationship Chart (ARC) dan Activity Relationship Diagram (ARD) (Studi Kasus: Tandi's Bakery),” Jurnal Teknik Industri Terintegrasi, vol. 8, no. 4, pp. 1–10, 2025, doi: 10.31004/jutin.v8i4.52873.

R. Pujianto, “Perancangan Tata Letak Fasilitas Menggunakan Metode From To Chart dan Activity Relationship Diagram Diaplikasikan dengan CRAFT dan BLOCPLAN,” Jurnal Ilmiah Research Student, vol. 2, no. 1, pp. 416–429, 2025.

N. Amaria, “Usulan Rancangan Tata Letak Fasilitas dengan Menggunakan Metode From To Chart (Studi Kasus: UD Karya Abadi),” Jurnal SENOPATI, vol. 4, no. 2, pp. 115–123, 2023.

F. K. Nurrahmat, I. Ruwana, and S. Indriani, “Perancangan Layout Fasilitas Produksi dengan Metode Algoritma BLOCPLAN untuk Mengoptimalkan Material Handling,” Jurnal Valtech, vol. 8, no. 2, pp. 480–487, 2025.

F. Laoh, “Perancangan Ulang (Re-Layout) Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning (SLP) dan Algoritma BLOCPLAN,” Jurnal Teknik Industri Terintegrasi, vol. 8, no. 1, pp. 1049–1059, 2025.

M. R. Hidayat, R. A. Pratama, and S. Wulandari, “Facility Layout Optimization Using Systematic Layout Planning and BLOCPLAN Algorithm to Minimize Material Handling Cost,” Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, vol. 27, no. 1, pp. 45–56, 2025, doi: 10.9744/jti.27.1.45-56.

Santoso, D. Kurniawan, and E. Prasetyo, “Integrated Activity Relationship Chart and Material Flow Analysis for Multi-Component Furniture Manufacturing Layout,” International Journal of Industrial Engineering and Management, vol. 16, no. 1, pp. 12–24, 2025, doi: 10.24867/IJIEM-2025-1-342.

Downloads

Published

2026-11-26

How to Cite

[1]
“White Modular Chair Factory Layout: Layout Pabrik Kursi Modular Putih”, PELS, vol. 10, no. 1, pp. 3676–3684, Nov. 2026, doi: 10.21070/3dwesc85.

Most read articles by the same author(s)

1 2 3 4 > >>