Preventive Maintenance Planning 500 Hm on Dump Truck Mercedes Benz Axor 4843k at PT. Mega Jasa Karya Bersama Site PT. Baramulti Sukses Sarana Perencanaan Preventif Maintenance 500 Hm Pada Dump Truk Mercedes- Benz Axor 4843k Di Pt. Mega Jasa Karya Bersama Site Pt. Baramulti Sukses Sarana

Main Article Content

Imam Hanafi
Anis Siti Nurrohkayati

Abstract

The problem that is often encountered is the service time that has passed from the time specified by the company, namely 500 HM. With the background of these problems, thoughts arise why there can be delays in service time at PT. Mega jasa Karya Bersama. The research method used is preventive maintenance which in this method prevents damage to the unit in operation by scheduling routine maintenance. In this method, replace components so that the unit's life can be longer, and minimize damage. Where in this study also looks for the average hour meter unit for one year, and also the cost of maintenance. The average result of Hm service for 1 year at PT. Mega Jasa Karya Bersama Site PT. Baramulti Suksessarana is 542 Hm. The total maintenance cost of 500 Hm on Dt MJKB-679 for 1 year in 2021 at PT. Mega Jasa Karya Bersama site PT. Baramulti Suksessarana is Rp. 27.440.000 (twenty seven million four hundred forty thousand rupiah). Estimated waktu service time 500 Hm is 25 days.


 

Downloads

Download data is not yet available.

Article Details

How to Cite
[1]
I. Hanafi and A. S. Nurrohkayati, “Preventive Maintenance Planning 500 Hm on Dump Truck Mercedes Benz Axor 4843k at PT. Mega Jasa Karya Bersama Site PT. Baramulti Sukses Sarana”, PELS, vol. 2, no. 2, Jun. 2022.
Section
Mechanical Engineering
Author Biographies

Imam Hanafi, Universitas Muhammadiyah Kalimantan Timur

Program Studi Teknik Mesin

Anis Siti Nurrohkayati, Universitas Muhammadiyah Kalimantan Timur

Program Studi Teknik Mesin

References

[1] Rizki Arga K., Heri Mujayin. 2015. Usulan Perawatan Mesin Stitching Dengan Metode Reliability Centered Maintenance. Universitas Muhammadiyah Malang. Malang
[2] Daryus, Asyari, 2019. Manajemen perawatan mesin. Universitas Darma Persada.
[3] Anggraini, W. dan Aditia, A. 2016. Simulasi Montecarlo pada Penjadwalan Preventive Maintenance Komponen Kritis Mesin Breaker dan Mesin Hammermill. Seminar Nasional Teknologi Informasi, Komunikasi dan Industri (SNTIKI) 8.
[4] Sudrajat, D. 2016. Pengaruh Preventive Maintenance Terhadap Hasil Produksi Pada Proses Produksi Mesin Area Line D Di PT. Triangle Motorindo. Fakultas Teknik. Universitas Negeri Semarang.
[5] Nudin, B., dan Iskandar, D. S. 2019. Analisis Pemeliharaan Mesin Ridger Palir Di PT Great Giant Pineapple. Universitas Tulang Bawang. Bandar Lampung
[6] Wahyuny Ranti, 2021. Perencanaan penjadwalan preventive maintenance mesin screw press di pt. Persada agro sawita. Fakultas sains dan teknologi universitas islam negeri sultan syarif kasim riau pekanbaru.
[7] Prayitno, B. E. 2017. Analisis Perawatan Mesin Produksi Dengan Menggunakan Metode Reliability Centered Maintenance (RCM) Pada PT. Prima Indah Saniton. Universitas Sumatera Utara. Medan.
[8] Faisyal, Darma aviva, Mustafa. 2017. Analisa Penyebab Kerusakan Komponen Heat Excharger Pada Sistem Pendingin Engine Marine 3306 Caterpillar. Politeknik Negri Samarinda. Samarinda.
[9] Giri Nugroho, Muhammad Dzaky F., Mashuri, Denny Me., Joko s. 2021. Implementasi Metode Reliability Centered Maintenance Pada Mesin Gilingan Di PG. Kremboong. Institut Teknologi Sepuluh November. Surabaya
[10] Purjiyono, Ningrum Astriawati, P. S. s. (2019). Perawatan Sistem Pelumasan Mesin Utama Pada Kapal Km. Mutiara Sentosa Ii. Teknovasi, 06, 74–80.

Most read articles by the same author(s)

1 2 > >>