A Implementation of Quality Control Activities in the Production Process at PT Ometraco Arya Samanta

Pelaksanaan Kegiatan Quality Control pada Proses Produksi di PT Ometraco Arya Samanta

Authors

  • Mochamad Diaz Zakaria Fakultas Sains dan Teknologi, Program Studi Teknik Industri, Universitas Muhammdiyah Sidoarjo
  • Boy Isma Putra Fakultas Sains dan Teknologi, Program Studi Teknik Industri, Universitas Muhammdiyah Sidoarjo

DOI:

https://doi.org/10.21070/j49zsx95

Keywords:

Quality Control, Finishing, Production, PT Ometraco Arya Samanta

Abstract

General Background Internship activities provide students with practical, real-world work experience to understand industrial manufacturing operations directly. Specific Background PT Ometraco Arya Samanta is a manufacturing company engaged in steel construction and structural metal fabrication. Knowledge Gap Although quality control procedures are applied during production, specific evaluations regarding finishing stage challenges like paint color discrepancies and coating thickness variations require comprehensive documentation. Aims This study aims to understand the implementation of Quality Control (QC) activities within the production process at PT Ometraco Arya Samanta. Results Findings indicate that quality control implementation adheres to company standard operating procedures (SOP), though occasional challenges occur during finishing stages such as paint color consistency and coating thickness. Novelty A structured operational review is established by linking incoming material inspection, process monitoring, and final coating checks within a steel manufacturing framework. Implications Implementing systematic quality control systems successfully maintains product standards and improves production process efficiency.

Key Findings Highlights

  1. Quality control procedures successfully monitor incoming materials, production processes, and final structural checks.

  2. Finishing stages encounter minor discrepancies regarding coating thickness consistency and paint color matching.

  3. Structured quality enforcement preserves product durability and enhances overall manufacturing efficiency.

Keywords

Quality control, Production, Finishing, Quality assurance, PT Ometraco Arya Samanta

References

F. Aksa, “Program Peningkatan Kemampuan Mahasiswa Menghadapi Dunia Kerja Melalui Kegiatan Magang di Kantor Imigrasi dan Koperasi Sangosay Atambua,” Jurnal Umum Pengabdian Masyarakat, no. 4, pp. 50–56, 2023.

M. Z. Rissa, R. H. Jamali, D. M. Jamali, M. Khannafi, and S. B. I. Kurniawan, “Jurnal Testing dan Implementasi Sistem Informasi Menggunakan Metode Spiral Attendance System and Internship Student Activities,” Jurnal Testing dan Implementasi Sistem Informasi, vol. 2, no. 2, pp. 111–123, 2024.

N. K. K. S. Nurhayanti and A. D. Nugroho, “Dampak Motivasi Kerja dan Keselamatan Terhadap Produktivitas,” Journal of Artificial Intelligence and Digital Business, vol. 4, no. 2, pp. 1610–1617, 2025.

M. Redzky and H. Wiwi, “Analisis Pengendalian Kualitas Produksi di PT. Ometraco Arya Samanta Menggunakan Metode Six Sigma,” Jurnal Teknik Mesin Unesa, vol. 5, no. 1, pp. 89–100, 2017.

S. A. Pratama, M. Fahreza, and M. K. Hidayat, “Analisis Pengendalian Kualitas Produk Menggunakan Metode SQC Dan Kaizen Pada PT. Laksana Tekhnik Makmur,” IMTechno: Journal of Industrial Management Technology, vol. 6, no. 1, pp. 1–8, 2025, doi: 10.31294/imtechno.v6i1.5388.

M. Roziqin and A. Hardjito, “Analisis Temperatur Benda Kerja Terhadap Kekerasan Cat Pada Proses Pengecatan Fabrikasi Metal Ducting,” Journal of Mechanical Engineering, vol. 1, no. 3, pp. 1–10, 2024, doi: 10.47134/jme.v1i3.3152.

V. Andika, S. Amalia, D. Herwanto, and V. A. Fauzan, “Implementasi Metode Root Cause Analysis (RCA) dan PDCA Dalam Mengurangi Defect Pada Proses Pengecatan Komponen Velg Mobil Pada PT XYZ,” Prosiding Seminar Nasional, pp. 297–304, 2025.

A. Saputra, T. D. Widodo, and L. Yuliati, “Pengaruh Variasi Sudut Dan Jarak Penembakan Sandblasting Pada Proses Pretreatment Terhadap Kualitas Pelapisan Cat Dan Sifat Korosi Pada Baja Karbon Rendah,” Jurnal Rekayasa Mesin, vol. 15, no. 1, pp. 93–102, 2024, doi: 10.21776/jrm.v15i1.1382.

Oktaviani, Hardiyono, and L. M. Zainul, “Identifikasi Bahaya Dan Penilaian Risiko Pada Proses Sandblasting Pt Budhi Wiguna Prima,” Sereal Untuk, vol. 51, no. 1, p. 51, 2018.

P. Bayuseno, “Analisa Laju Korosi pada Baja untuk Material Kapal Dengan dan Tanpa Perlindungan Cat,” Rotasi, vol. 11, no. 3, pp. 32–37, Feb. 2012, doi: 10.14710/rotasi.11.3.32-37.

M. D. Zakaria and B. I. Putra, “Implementation of Quality Control Activities in the Production Process at PT Ometraco Arya Samanta,” UMSIDA, 2026.

2868 laporan+magang+diaz+FIX.docx

Santoso and D. Irawan, “Evaluasi Mutu Lapisan Pelindung dan Cat pada Struktur Baja Konstruksi Berat,” Jurnal Teknik Industri Terintegrasi, vol. 7, no. 2, pp. 140–148, 2024.

H. Prasetyo and D. Sutopo, “Penerapan Standar Operasional Prosedur Quality Control pada Industri Manufaktur Baja,” Jurnal Optimalisasi Sistem Industri, vol. 21, no. 1, pp. 33–42, 2022.

W. Santoso and Y. Kurniawan, “Analisis Cacat Produk pada Proses Finishing Struktur Baja Fabrikasi,” Jurnal Rekayasa Mesin, vol. 14, no. 2, pp. 310–318, 2023.

F. Rahman and R. Hidayat, “Strategi Pengendalian Kualitas untuk Menurunkan Angka Rework pada Industri Manufaktur Logam,” Jurnal Sistem dan Manajemen Industri, vol. 8, no. 1, pp. 50–59, 2024.

Downloads

Published

2026-11-13

How to Cite

[1]
“A Implementation of Quality Control Activities in the Production Process at PT Ometraco Arya Samanta: Pelaksanaan Kegiatan Quality Control pada Proses Produksi di PT Ometraco Arya Samanta”, PELS, vol. 10, no. 1, pp. 3026–3035, Nov. 2026, doi: 10.21070/j49zsx95.

Most read articles by the same author(s)

1 2 > >>