Analysis of Work System Design to Increase Production Productivity Using the MOST (Maynard Operation Sequence Technique) Method (Case Study of PT. Segar Murni Utama) Analisis Perancangan Sistem Kerja Untuk Meningkatkan Produktivitas Produksi Menggunakan Metode MOST (Maynard Operation Sequence Technique) (Studi Kasus PT. Segar Murni Utama)

Main Article Content

Ifan Wahyu Pranata Dewantara
Boy Isma Putra

Abstract

PT. Segar Murni Utama is a company engaged in the mineral water industry, especially the production of MOJO TRAS demineralized water. PT. Segar Murni Utama introduces demineralized water products widely and is marketed among the general public to meet the needs of the community. This company prioritizes the quality of demineralized water very well.The purpose of this study was to optimize the production operator time for the cup section and optimize the packing process time for the cup section using the MOST (Maynard Operation Sequence of Technique) method. MOST (Maynard Operation Sequence Tecnique) is one of several ways of timing sub-operations or movements. The BEST method includes basic sort patterns.The results of this study in the cup production operator section showed that the right hand and left hand maps were known to have 8 activities, and 8 activities on the process flow map. The total time is 1410, the normal time (WN) is 0.85 minutes, the standard time (WS) is 0.017 hours, the standard output (OS) is 59 cartons/hour, and the final calculation result is 413 cartons/day. While the results of improvements in the packing cup section obtained the following results: Right hand and left hand maps are known to have 11 activities, and 11 activities on the process flow map. The total time is 2110, the normal time (WN) is 1.26 minutes, the standard time (WS) is 0.023 hours, the standard output (OS) is 43 cartons/hour, and the final calculation result is 301 cartons/day.

Downloads

Download data is not yet available.

Article Details

How to Cite
[1]
I. W. P. Dewantara and B. I. Putra, “Analysis of Work System Design to Increase Production Productivity Using the MOST (Maynard Operation Sequence Technique) Method (Case Study of PT. Segar Murni Utama)”, PELS, vol. 3, Dec. 2022.
Section
Industrial Engineering

References

[1] Desmiarti, Reni dkk, 2017. “Kombinasi Proses Filtrasi dan Ion Exchange Secara Kontinu Pada Pembuatan Aquadm (Demineralized Water)”. Padang: Universitas Bung Hatta Padang. Fakultas Teknologi Industri. Jurusan Teknik Kimia. Vol. 4, No. 1, Hal. 27-32.
[2] Sutopo, Eko Hari, 2019. “Proses Demineralisasi Air Tanah Menjadi Air TDS 0 ppm Menggunakan Metode Resin Penukar Ion Tunggal (Single Ionik Resin Exchange Method)”. Banten: Universitas Pamulang. Teknik Mesin. Vol. 1, No. 1, Hal 33-38.
[3] Rusdi dan Wardalia, 2018. “Pembuatan Aquademineralized dari Limbah Air AC (Air Conditioner) dengan Menggunakan Teknologi Reverse Osmosis”. Banten: Universitas sultan Ageng Tirtayasa. Fakultas Teknik. Teknik Kimia. Vol. 12, No. 2, Hal. 143-150.
[4] Ristyowati, Trismi dan Tri Wibawa, 2018. “Perancangan Sistem Kerja untuk Meningkatkan Hasil Produksi Melalui Pendekatan Macroergonomic Anaysis and Design Di Sentra Industri Batik Ayu Arimbi Sleman”. Yogyakarta: UPN Veteran Yogyakarta. Fakultas Teknik Industri. Jurusan Teknik Industri. Vol. 11, No. 2, Hal. 126-133.
[5] Putra, Boy Isma dan Ribangun Bamban Jakaria, 2020. “Perancangan Sistem Kerja”. UMSIDA Press.
[6] Puryani dkk, 2018. “Perancangan Sistem Kerja untuk Meningkatkan Produktivitas dengan Pendekatan Sistem Sosioteknik”. Yogyakarta: Universitas Pembangunan Nasional Veteran Yogyakarta. Fakultas Teknik Industri. Prgram Studi Trknik Industri. Vol. 11, No. 1, Hal. 94-104.
[7] Manik, Sudarmin dan Nova Syafrina, 2018. “Faktor-Faktor yang Mempengaruhi Produktivitas Kerja Karyawan Pada Bank Danamon Simpan Pinjam”. Riau: Sekolah Tinggi Ilmu Ekonomi Riau. Vol. 3, No. 1, Hal. 49-60.
[8] Laksmiari, Ni Putu Pradita, 2019. “Pengaruh Motivasi Kerja Terhadap Produktivitas Kerja Karyawan Pada Perusahaan Teh Bunga Teratai Di Desa Patemon Kecamatan Serrit”. Singaraja: Universitas Pendidikan Ganesha. Jurusan Pendidikan Ekonomi. Vol. 11, No. 1, Hal. 54-63.
[9] Sasfebrinogi, Deiky, 2019. “Analisis Faktor-Faktor yang Mempengaruhi Peningkatan Produktivitas Kerja Pegawai Pada Badan Kepegawaian Pengembangan Sumberdaya Manusia Kota Metro”. Universitas Muhammadiyah Metro. Program Studi Magister Manajemen. Vol. 2, No. 3, Hal. 137-146.
[10] Lumbantobing, Hariman dkk, 2018. “Analisis Gerakan Kerja untuk Memperbaiki Metode Kerja dan Efisiensi Waktu Pengerjaan Produk Menggunakan Metode MOST (Studi Kasus PT. Infineon Technologies Batam). Kepulauan Riau: Universitas Riau Kepulauan Batam.Teknik Industri. Vol. 6, No. 2, Hal. 66-71.
[11] Isroni, Bani, 2020. “Peningkatan Produktifitas Assembling Melalui Perbaikan Proses Setting dengan Metode DMAIC dan Maynard Operation Sequence Technique (MOST) Di PT. XYZ”. Banten: Universitas Pamulang. Universitas Bina Sarana Informatika. Vol. 5, No. 3, Hal. 70-78.
[12] Annisa, Rullie dkk, 2020. “Penentuan Waktu Standart dengan Pendekatan Maynard Operation Sequence Technique”. Madura: Universitas Trunojoyo Madura. Fakultas Teknik. Teknik Industri. Vol. 20, No. 2, Hal. 7-12.

Most read articles by the same author(s)

1 2 > >>