Totaliproductive Maintenance (Tpm) Analysis Using the Overall Equipment Effectiveness (Oee) Method and Six Big Losses on an Injection Molding Machine
Analisis Totaliproductive Maintenance (Tpm) Menggunakan Metode Overall Equipment Efectiveness (Oee) Dan Six Big Losses Pada Mesin Moulding Injection
Abstract
. PT. XYZ is a manufacturing companyjthat produces a variety of materials from plastics, this company cangnot be separated from problems relatedhto the effectiveness of machinery / equipment. The problem that is experienced today is that there is a lot of damage to the injection moulding machine that has decreased speed as a result of the damage to the number of defect parts because the machine often experiences breakdown. Data collection is conducted with structured observations and interviews. To solve the problem that occurs, done a machine maintenance or maintenance by means of measurement using the method of Total Productive Maintenance which includes Overall Equipment Effectiveness and Six Big Losses. This study aims to determine the level of equipment total production process, to determine the factors causing the valuenof overall equipment Efectivenees (OEE) low and identify losses that occur with the standard value of
Downloads
References
Andita rahayu, (2014). EVALUASIEEFEKTIVITAS MESINHKLIN DENGANHPENERAPAN TOTALLPRODUCTIVE MAINTENANCE PADAVPABRIK PT SEMEN PADANG. Vol.13 No.1 April 2014 DOI: https://doi.org/10.25077/josi.v13.n1.p454-485.2014
Anwar,,Syukriah, Muslem (2016). ANALISISVOVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM MEMINILIMALISIR SIX BIGLLOSSES PADA MESIN PRODUKSI DI UD. HIDUPHBARU. Industrial Engineering Journal Vol.5 No.2 (2016) 52-57 Deny Andesta M. Nur Hasyim, Said Salim Dahda.(2018). ANALISA NILAI OVERALL EQUIPMENT EFFECTIVENESS PADA MIXING MACHINE TYPE B.
Ashish M Gohil, Dhaval B Shah, Ranteshwar Singh* (2012). TOTAL PRODUCTIVE MAINTENANCE (TPM) IMPLEMENTASI DI SEBUAH MESIN. Procedia Teknik 51 (2013) 592-599. DOI: https://doi.org/10.1016/j.proeng.2013.01.084
Deny Andesta M. Nur Hasyim, Said Salim Dahda.(2018). ANALISANNILAI OVERALL EQUIPMENTEEFFECTIVENESS PADA MIXING MACHINE TYPE B.
Eko Nursubiyantoro, Mohamad Isnaini Rozaq, dan Puryani(2016). IMPLEMENTASI TOTAL PRODUCTVE MAINTENANCE (TPM) DALAM PENERAPAN OVERALL EQUIPMENT EFFECTIVENESS (OEE). Jurnal OPSI Vol. 9 No.1 Juni 2016. DOI: https://doi.org/10.31315/opsi.v9i01.2169
Hermanto. (2016) PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS PADA DIVISI PAINTING DI PT.AIM. jurnal metris, 17 (2016): 97-106
Hery Suliantoro, Heru Prastawa, Novie Susanto*), dkk. (2017). PENERAPAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FAULT TREE ANALYSIS (FTA) UNTUK MENGUKUR EFEKTIFITAS MESIN RENG. Jurnal Teknik Industri Vol. 12, No.2, Mei 2017 DOI: https://doi.org/10.14710/jati.12.2.105-118
Irwan Yulianto, Rispianda, Hendro Prassetiyo. (2014). RANCANGAN DESAIN MOLD PRODUK KNOB REGULATOR KOMPOR GAS PADA PROSES INJECTION MOLDING*. No.03 Vol.02, Juli 2014
[ Pratikno, Rahmad, SlametNWahyudi. (2012). PENERAPANVOVERALLLEQUIPMENT EFFECTIVENESSL(OEE) DALAM IMPLEMENTASI TOTALLPRODUCTIVE MAINTENANCE (TPM). Vol.3, No.3 tahun 2012 : 431-437