Pikachu Modular Chair Factory Layout
Layout Pabrik Kursi Modular Pikachu
DOI:
https://doi.org/10.21070/rzynvb30Keywords:
Facility layout design, Modular chair, Material handling, Blocplan, ErgonomicsAbstract
General Background The optimal layout design of a production facility remains crucial to ensuring smooth manufacturing operations and maintaining operational efficiency. Specific Background In the practical design of facilities for manufacturing a Pikachu-themed modular chair, integrating ergonomics, smooth material flow, and interdepartmental activity interactions is essential. Knowledge Gap Although traditional layout planning addresses material transport, comprehensive integration combining multi-product process charts, activity relationship analysis, from-to charts, and computerized heuristic algorithms like Blocplan requires systematic evaluation. Aims This study aims to design and optimize the production facility layout for manufacturing a modular chair by utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From-To Chart (FTC), and Blocplan algorithm. Results The results indicate that the proposed layout significantly improves material flow, optimizes interdepartmental relationships, and minimizes material handling distances and costs by strategically positioning raw material warehouses near measurement, cutting, and assembly areas. Novelty A structured framework is established by synthesizing MPPC, ARC, FTC, and Blocplan computer-aided heuristics specifically for modular furniture manufacturing layouts. Implications Implementing this optimized layout effectively supports manufacturing efficiency, operational productivity, and workflow continuity in industrial facility design.
Key Findings Highlights
-
Integrating multi-product process mapping with activity relationship charts successfully reorganizes modular furniture production workflows.
-
Computer-aided Blocplan optimization identifies superior layout alternatives that drastically reduce material handling costs and distances.
-
Placing raw material warehouses adjacent to measurement and assembly departments eliminates unnecessary transportation bottlenecks.
Keywords Facility layout design, Modular chair, Material handling, Blocplan, Ergonomics
References
G. J. Saputra and D. Romahadi, "Analisis Komparasi Kekuatan Geometri Desain Rusuk Penguat pada Kursi Plastik menggunakan Computer Aided Engineering," Jurnal Teknik Mesin, vol. 12, no. 1, Feb. 2023.
R. Fitrian, "Perancangan Kursi Duduk-Berdiri Berdasarkan Pendekatan Antropometri di PT. Otscon Safety Indonesia," Productum: Jurnal Desain Produk (Pengetahuan dan Perancangan Produk), vol. 4, no. 2, pp. 137–144, Dec. 2021.
G. V. Kurniawan, G. Mulyono, and T. Rizqy, "Pengembangan Desain Kursi New Normal untuk Fasilitas Duduk Publik," Pengetahuan dan Perancangan Produk, vol. 5, no. 1, pp. 41–48, 2022.
J. Immanuel, A. Santoso, and M. Hartono, "Analisis Perancangan Tata Letak Fasilitas di Perusahaan XYZ Produksi Kedelai dengan Systematic Layout Planning," JENIUS: Jurnal Terapan Teknik Industri, vol. 4, no. 2, pp. 250–261, Nov. 2023, doi: 10.37373/jenius.v4i2.555.
Hermawan and S. O. Dedy, Buku Ajar Perancangan Tata Letak Fasilitas. Bangkinang Kota, Riau: CV. Nulis Hemat, 2025. [Online]. Available: www.nulishemat.com
B. Sulistyo and H. N. Ikhsan, "Optimalisasi Tata Letak Workshop Fabrikasi dengan Metode ARC di PT XYZ," Journal of Industrial & Quality Engineering, vol. 12, no. 2, Dec. 2024, doi: 10.34010/owe.v12i2.14385.
Utami and V. F. Sanjaya, "Pengaruh Tata Letak Gudang Terhadap Kelancaran Distribusi Barang ke Konsumen di Kantor Cabang Alfamart Kotabumi," Entrepreneurship Bisnis Manajemen Akuntansi (E-BISMA), vol. 3, no. 1, pp. 01–10, 2022, doi: 10.37631/e-bisma.v3i1.513.
D. T. Wirawan and A. Bellanov, "Perancangan Fasilitas Tata Letak Pada UMKM Sari Kedelai Sehati," Industrial & System Engineering Journals, vol. 3, no. 1, pp. 208–218, 2024.
S. Z. Nisa’ and W. Setiafindari, "Perancangan Ulang Tata Letak Fasilitas Untuk Meminimalkan Jarak Material Handling Menggunakan Algoritma CORELAP," Jurnal Teknologi dan Manajemen Industri Terapan (JTMIT), vol. 2, no. 4, pp. 250–260, 2023.
K. Sandi and S. D. Harijanto, "Analisis Perhitungan Harga Pokok Produksi Terhadap Pembuatan Lemari Depot Air Minum Isi Ulang di UD Hajir Filter," Journal of Industrial Engineering and Management System, vol. 16, no. 2, pp. 10–27, 2023. [Online]. Available: https://journal.ubm.ac.id/index.php/jiems
W. Findiastuti, Perancangan Tata Letak Fasilitas Mini Plant Garam. Malang: MNC Publishing, 2021.
E. Y. Firmansyah, R. O. Putri, I. Lukman, F. Hidayatulloh, A. F. Siswoyo, and K. A. Husyairi, "Analisis Tata Letak Fasilitas PT Mandiri Banana Indonesia dengan Mengaplikasikan Metode Activity Relationship Chart (ARC) dan Total Closeness Rating (TCR)," Mikroba: Jurnal Ilmu Tanaman, Sains Dan Teknologi Pertanian, vol. 2, no. 3, pp. 12–23, 2025, doi: 10.62951/mikroba.v2i3.515.
Y. Suhandinata, "Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode From To Chart pada Perusahaan Meubel di CV. Esa Banyuwangi," Jurnal Sipil Terapan, vol. 1, no. 1, pp. 192–221, May 2023, doi: 10.58169/jusit.v1i1.602.
R. Pujianto, A. Y. K. Y. Tonbesi, B. L. Rahman, B. E. Prastyo, M. A. Azis, and Suseno, "Perancangan Tata Letak Fasilitas Menggunakan Metode From To Chart dan Activity Relationship Diagram Diaplikasikan dengan CRAFT dan BLOCPLAN," Jurnal Ilmiah Research Student, vol. 2, no. 1, pp. 416–429, 2025.
S. Saffanah, R. A. Imran, and A. A. Sibarani, "Usulan Perancangan Tata Letak Lantai Produksi dengan Metode SLP dan BLOCPLAN pada Produk Cutting Steel Pipe di CV. ABC di Cileungsi," Jurnal Rekayasa Sistem Industri, vol. 8, no. 2, 2023.
M. N. Fitriyan, W. A. Balol, and N. Sigit, "Optimasi Tata Letak Laboratorium Kalibrasi dan Ruang Logistik dengan Pendekatan Systematic Layout Planning dan Blocplan," Sanskara Manajemen dan Bisnis, vol. 4, no. 01, pp. 214–224, 2025, doi: 10.58812/smb.v4i01.
U. Kholifah and Suhartini, "Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode Systematic Layout Planning dan BLOCPLAN untuk Meminimasi Biaya Material Handling pada UD. Sofi Garmen," Journal of Research and Technology, vol. 7, no. 2, p. 151, Dec. 2021.
Adiasa, N. Hudaningsih, and Sartika, "Perancangan Tata Letak Fasilitas Gudang Pada Pembangunan Jetty PLTMGU Lombok Peaker Menggunakan Metode Systematic Layout Planning (SLP) dengan Algoritma BLOCPLAN," JINTEKS, vol. 5, no. 1, pp. 202–209, Feb. 2023.
Downloads
Published
Issue
Section
Categories
License
Copyright (c) 2026 Muhammad Rangga Eka Mukti, Mohammad Nabil Makarim, David Aditya Pratama, Satriya Surya Nugraha, Muhammad Angga Yudhistira, Athika Shidi Cahyana

This work is licensed under a Creative Commons Attribution 4.0 International License.
