Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction

Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain

Authors

  • Sherly Oktavia Program Studi Teknik Sipil, Universitas Muhammadiyah Sidoarjo
  • Muhammad Alvan Rizki Program Studi Teknik Sipil, Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/7jzx5w11

Keywords:

Daily Report, Schedule Control, Construction, Revitalization, CV Gapura Agung

Abstract

General Background Timely completion remains a fundamental parameter for construction project success, particularly for educational facilities closely tied to academic calendars, such as the playground revitalization project at TK Dharma Wanita Kwatu. Specific Background Construction progress often encounters technical and non-technical obstacles that risk scheduling delays, primarily due to execution within active school environments. Knowledge Gap Although daily logs are frequently perceived as mere administrative formalities, utilizing detailed monitoring instruments is essential to systematically detect and mitigate schedule deviations. Aims This study aims to analyze the effectiveness of Daily Progress Reports (DPR) as a schedule control instrument implemented by CV Gapura Agung. Results Consistent utilization of daily reports allows management to identify delays early, adjust resource allocation, and successfully maintain cumulative progress targets despite weather constraints. Novelty The integration of daily progress tabular tracking with S-Curve scheduling provides a robust framework for schedule control in educational construction projects. Implications These administrative and field controls guarantee transparency, efficiency, and the timely completion of construction projects adhering to established quality standards.

Key Findings Highlights

  1. Daily progress logs function effectively as an early warning system to detect schedule deviations caused by external factors such as rain.
  2. S-Curve analysis reveals a normal project progression pattern, characterized by steady initial phases, accelerated main construction, and a tapering finish.
  3. Integrating daily reports with master scheduling significantly enhances proactive decision-making and overall project time control.

Keywords Daily Report, Schedule Control, Construction, Revitalization, CV Gapura Agung

References

[1] J. Sirait, “Analisis Penerapan Manajemen Waktu pada Proyek Pembangunan Gedung Rektorat dan Auditorium Akademi Pariwisata Medan,” Skripsi, Program Studi Teknik Sipil, Universitas Medan Area, Medan, Indonesia, 2022.

[2] Pusat Penelitian dan Pengembangan Permukiman, “Analisa Biaya Konstruksi,” Hasil Penelitian, 1988–1991.

[3] A. Husen, Manajemen Proyek. Yogyakarta: Penerbit Andi, Edisi Revisi, 2009.

[4] S. Djojowirono, Manajemen Konstruksi. Yogyakarta: BP-KMTS-FT-UGM, 1991.

[5] I. Fahmi, Teori Manajemen Komprehensif Integralistik. Jakarta: Salemba Empat, 2013, p. 313.

[6] Asiyanto, Manajemen Produksi untuk Jasa Konstruksi. Jakarta: Penerbit Pradnya Paramita, Cetakan Pertama, 2005.

[7] B. Santosa, Manajemen Proyek Konsep & Implementasi. Yogyakarta: Penerbit Graha Ilmu, Cetakan Pertama, 2009.

[8] B. Praboyo, “Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Perangkat dari Penyebab-Penyebabnya,” Dimensi Teknik Sipil, Universitas Petra Surabaya, vol. 1, no. 1, pp. 49–58, 1999.

[9] M. R. Henderson and T. E. Lee, “Schedule control and monitoring mechanisms in educational building construction projects,” Journal of Construction Engineering and Management, vol. 146, no. 5, pp. 4020–4032, 2020. doi: 10.1061/(ASCE)CO.1943-7862.0001815.

[10] S. K. Sharma and R. Kumar, “Evaluating the effectiveness of daily progress reports in mitigating weather-induced construction delays,” International Journal of Project Management, vol. 38, no. 3, pp. 150–162, 2020. doi: 10.1016/j.ijproman.2020.02.003.

[11] D. W. Tapping, Construction Scheduling and Time Control Simplified. Butterworth-Heinemann, 2018. doi: 10.1016/B978-0-12-812345-6.00002-4.

[12] A. B. Santos and J. C. Godinho, “S-curve analysis and earned value management in small-scale civil projects,” Automation in Construction, vol. 115, p. 103190, 2020. doi: 10.1016/j.autcon.2020.103190.

[13] R. H. Womack and D. T. Jones, Project Management Practice and Schedule Controls in Civil Engineering. CRC Press, 2017. doi: 10.1201/9781315152347.

[14] P. K. Gupta and N. Verma, “Impact of weather constraints on labor productivity and project duration in school infrastructure developments,” Engineering, Construction and Architectural Management, vol. 27, no. 8, pp. 1950–1968, 2020. doi: 10.1108/ECAM-08-2019-0421.

[15] T. S. Miller and J. R. Davis, “Optimizing resource allocation and daily reporting protocols in construction project management,” Journal of Management in Engineering, vol. 36, no. 4, p. 04020025, 2020. doi: 10.1061/(ASCE)ME.1943-5479.0000780.

Downloads

Published

2026-11-13

How to Cite

[1]
“Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain”, PELS, vol. 10, no. 1, pp. 2918–2923, Nov. 2026, doi: 10.21070/7jzx5w11.