Analyisis Of Boiler Reliability Maintenance System With Availability Ratio At PT. XXX
Analisa Sistem Perawatan Keandalan Boiler Dengan Rasio Availability Di PT. XXX
DOI:
https://doi.org/10.21070/pels.v7i0.1564Keywords:
Minimum Downtime, Corrective Procedures, Preventive Scheduling, Steam Generation, Mechanical DegradationAbstract
General Background Machinery and equipment play a vital role in determining organizational productivity within the commercial noodle production sector. Specific Background Steam-generating vessels utilizing coal fuel are essential for supplying heat during the steaming, drying, and frying operations in these facilities. Knowledge Gap Irregular servicing protocols and unexpected mechanical breakdowns frequently cause extended machine stoppage, leading to substantial output target losses and compromised operational efficiency. Aims This study investigates appropriate servicing systems and calculates equipment readiness metrics to prevent permanent machine disruptions. Results Quantitative observation utilizing primary operational data revealed an 89 percent readiness metric, indicating an 11 percent failure probability for the steam-generating systems. Key mechanical issues identified include silica scale formation, component degradation from uncrushed coal, and hopper corrosion. Proposed solutions encompass daily to annual preventive schedules, regular water blowdowns of 244 liters to reduce dissolved solids, mechanical cleaning, and anti-corrosion coating applications. Novelty The research formulates a specific component replacement schedule strictly based on total minimum downtime calculations for industrial steam systems. Implications Implementing these scheduled preventive and corrective procedures minimizes operational stoppage, preserves continuous production flow, and significantly suppresses major repair costs.
Highlights:
-
Quantitative observation identified silica scale, hopper corrosion, and screw feeder degradation as primary breakdown causes.
-
Calculating operational uptime versus standby periods revealed an 89 percent equipment readiness metric with an 11 percent failure probability.
-
Scheduled component replacement based on total minimum downtime calculations significantly decreases machine stoppage and prevents production losses.
Keywords: Minimum Downtime, Corrective Procedures, Preventive Scheduling, Steam Generation, Mechanical Degradation
Downloads
References
T. Rahmania, A. R. Matondang, and N. Matondang, “Perbaikan sistem perawatan mesin pada PT XYZ,” Jurnal Sistem Teknik Industri, vol. 18, no. 2, pp. 47–50, 2016, doi: 10.32734/jsti.v18i2.344.
Y. Daeng Polewangi, “Analisis sistem perawatan boiler di PT. Dewa Rencana Perangin-Angin,” JIME (Journal of Industrial and Manufacture Engineering), vol. 2, no. 1, pp. 29–33, 2018, doi: 10.31289/jime.v2i1.2428.
P. B. Pratama and K. Jainuri, “Perencanaan perawatan mesin boiler dengan pendekatan Reliability Centered Maintenance (RCM) pada PT. Bumi Khatulistiwa.”
Y. Rosa, “Perencanaan dan penerapan preventive maintenance peralatan laboratorium,” Jurnal Teknik Mesin, vol. 2, no. 2, pp. 107–119, 2005.
S. D. Pandi, H. Santosa, and J. Mulyono, “Perancangan preventive maintenance pada mesin corrugating dan mesin flexo di PT. Surindo Teguh Gemilang,” Jurnal Ilmiah Widya Teknik, vol. 13, no. 1, pp. 33–38, 2014, doi: 10.33508/wt.v13i1.1461.
Y. R. Rosyid, “Manajemen perawatan pada boiler utilitas batu bara PT. Petrokimia Gresik,” Project Report, Institut Teknologi Sepuluh Nopember, Surabaya, 2021. Tidak memiliki DOI.
H. Rachman, A. K. Garside, and H. M. Kholik, “Usulan perawatan sistem boiler dengan metode Reliability Centered Maintenance (RCM),” Jurnal Teknik Industri, vol. 18, no. 1, pp. 86–93, 2017, doi: 10.22219/JTIUMM.Vol18.No1.86-93.
A. F. Kristanto, “Meminimalisir gangguan dengan preventive maintenance boiler di pembangkit listrik tenaga uap (studi kasus pada PT. PJB UBJOM PLTU Rembang),” Jurnal Energi dan Manufaktur, vol. 15, no. 1, pp. 32–41, 2022, doi: 10.24843/JEM.2022.v015.i01.p05.
A. S. K. R. Q. Alazemi, M. Y. Ali, and M. R. C. Daud, “Preventive maintenance of boiler: A case of Kuwait industry,” International Journal of Engineering Materials and Manufacture, vol. 4, no. 2, pp. 48–58, 2019, doi: 10.26776/ijemm.04.02.2019.02.
N. A. Silviana, “Usulan perawatan komponen kritis pada boiler feed pump dengan menggunakan metode preventive maintenance,” Jurnal Ilmiah Teknik Industri Prima (JURITI PRIMA), vol. 4, no. 1, 2022, doi: 10.34012/juritiprima.v4i1.1615.
S. S. Patil and A. K. Bewoor, “Optimization of maintenance strategies for steam boiler system using reliability-centered maintenance (RCM) model: A case study from Indian textile industries,” International Journal of Quality & Reliability Management, vol. 39, no. 7, pp. 1745–1765, 2022, doi: 10.1108/IJQRM-07-2021-0216.
S. S. Patil, A. K. Bewoor, R. Kumar, M. H. Ahmadi, M. Sharifpur, and S. PraveenKumar, “Development of optimized maintenance program for a steam boiler system using Reliability-Centered Maintenance approach,” Sustainability, vol. 14, no. 16, p. 10073, 2022, doi: 10.3390/su141610073.
M. B. Zaman, D. Priyanta, and B. S. S. Putra, “Determination of maintenance task on tanker vessel’s marine boiler using Reliability Centered Maintenance (RCM) II method,” International Review of Mechanical Engineering, vol. 15, no. 5, pp. 228–236, 2021, doi: 10.15866/ireme.v15i5.19061.
H. H. Azwir, A. I. Wicaksono, and H. Oemar, “Manajemen perawatan menggunakan metode RCM pada mesin produksi kertas,” Jurnal Optimasi Sistem Industri, vol. 19, no. 1, pp. 12–21, 2020, doi: 10.25077/josi.v19.n1.p12-21.2020.
M. Bastuti, D. Alfian, and M. F. B. C. K. “Penerapan Reliability Centered Maintenance (RCM) untuk perawatan mesin Twin Screw Extruder,” TRAKSI: Majalah Ilmiah Teknik Mesin, vol. 21, no. 2, 2021, doi: 10.26714/traksi.21.2.2021.%.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Luthfi Frans Setiawan, Edi Widodo

This work is licensed under a Creative Commons Attribution 4.0 International License.
