Periodic Maintenance Analysis of Diesel Motor Generator Set 900 kVA Power as Backup Energy Analisis Pemeliharaan Berkala Motor Diesel Generator Set Daya 900 kVA Sebagai Energi Cadangan

Main Article Content

Rois Nur Rofiq Salam
Edi Widodo

Abstract

In the realm of backup power sources, maintaining the efficiency of generators is paramount for ensuring reliability and availability during power outages. This study aims to evaluate generator efficiency through routine maintenance analysis, adhering to regulatory frameworks outlined in regulations such as Regulation No. 29 of 2012 and Electricity Law No. 30 of 2009. By employing methods including Mean Time Between Failures (MTBF) and assessing Actual Operating Time (AOT) against Specified Operating Time (SOT), this research determines the availability and compliance of each generator. Results highlight the importance of stringent regulatory compliance in enhancing the functionality and reliability of generators, thereby emphasizing the significance of routine maintenance for improved operational health.


Highlight :


  • Adherence to regulatory frameworks ensures operational compliance and reliability.

  • Routine maintenance analysis enhances generator efficiency and availability.

  • Availability assessment methods such as MTBF and AOT provide insights into operational health.

Keywords: Generator reliability, Routine maintenance, Regulatory compliance, Availability assessment, Backup power sources

Downloads

Download data is not yet available.

Article Details

How to Cite
[1]
R. N. Rofiq Salam and E. Widodo, “Periodic Maintenance Analysis of Diesel Motor Generator Set 900 kVA Power as Backup Energy”, PELS, vol. 7, pp. 1-9, Feb. 2024.
Section
Mechanical Engineering

References

[1] F. Kurniawan, “Manajemen Perawatan Industri,” Graha Ilmu, Yogyakarta. 2013.
[2] M. S. Siregar, J. Junaidi, A. Irwan, and H. Ibrahim, “Analisis Pemeliharaan Berkala pada Motor Diesel Generator Set Daya 90 kVA sebagai Energi Listrik Cadangan di UPT Rumah Sakit Khusus Paru,” Sinergi Polmed J. Ilm. Tek. Mesin, vol. 3, no. 1, pp. 55–67, 2022, doi: 10.51510/sinergipolmed.v3i1.700.
[3] D. R. Pamungkas, W. . Bhirawa, and B. Arianto, “Analisa Performansi Pemeliharaan Generator Set (Genset) dengan Metode TPM (Total Productive Maintanance) untuk Meningkatkan Kerja di PT. Lativi Media Karya,” Tek. Ind., vol. 8, no. 1, p. 5, 2019, [Online]. Available: https://journal.universitassuryadarma.ac.id/index.php/jtin/article/view/803
[4] I. P. A. Chrisna Budi, I. W. Sukerayasa, and I. D. Giriantari, “Perencanaan Rekonfigurasi Jaringan Tegangan Menengah Pada Kampus Universitas Udayana Bukit Jimbaran,” Maj. Ilm. Teknol. Elektro, vol. 15, no. 1, p. 56, 2016, doi: 10.24843/mite.2016.v15i01p10.
[5] M. Farhan, “Pengaruh Pembebanan Terhadap Arus Eksitasi Generator Unit 2 Pltmh Curug,” J. Simetrik, vol. 11, no. 1, pp. 398–403, 2021, doi: 10.31959/js.v11i1.653.
[6] “Sebayang M.D & Tarigan, B. M. (2013) Pengoperasian dan Perawatan Generator Set 500 KVA. Seminar Nasional Inovasi dan Rekayasa Teknologi (SNIRT) ke-II,1-12..pdf.”
[7] P. B. Santoso and D. B. Darmadi, “Perkakas Di Laboratorium Proses Manufaktur Jurusan,” vol. 9, no. 2, pp. 109–118, 2018.