“Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit Train Using the Lean Manufacturing : Analisis Pemborosan Dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing ”. Procedia of Engineering and Life Science 10, no. 1 (November 18, 2026): 3058–3065. Accessed November 20, 2026. https://pels.umsida.ac.id/index.php/PELS/article/view/2841.