Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain. Procedia of Engineering and Life Science, [S. l.], v. 10, n. 1, p. 2918–2923, 2026. DOI: 10.21070/7jzx5w11. Disponível em: https://pels.umsida.ac.id/index.php/PELS/article/view/2847. Acesso em: 15 nov. 2026.