Facility Layout of Modular Bear Chair

Layout Pabrik Kursi Modular Beruang

Authors

  • Kelompok Delapan 8 Universitas Muhammadiyah Sidoarjo
  • Atikha Sidhi Cahyana Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/xey77c89

Keywords:

Facility layout planning, Activity relationship chart, Activity relationship diagram, From to chart, Blocplan

Abstract

General Background Seating equipment supports daily tasks requiring precision, yet improper ergonomics and poorly organized production areas can strain workers and raise manufacturing expenses. Specific Background Producing multi-component wooden furniture involves sequential operations from raw material storage to finishing and assembly, where department arrangement governs internal movement. Knowledge Gap Applying qualitative closeness mapping, material flow tables, and heuristic layout generation to a multi-part wooden seating line requires clearer alignment between reported figures and spatial configuration. Aims This study evaluates the production workflow and facility layout for a modular bear chair using Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From To Chart, and BLOCPLAN. Results Actual machine counts across four listed departments were documented, total material handling across departments reached 1,603 with a total cost of Rp4,535,463, and layout 10 was chosen among ten alternatives with an adjacency score of 0.80 and a relative distance score of 0.67. Novelty The work combines component-level process mapping, closeness ratings, material flow costing, and heuristic layout selection for a seven-item modular chair configuration. Implications The findings provide practical reference data for structuring multi-component woodworking workflows and managing material transport costs, subject to harmonizing minor numerical and naming discrepancies in the manuscript.

Key Findings Highlights
  1. Actual equipment counts were recorded across measurement, cutting, smoothing, and drilling operations, including 1 measuring tape per operation, up to 3 table saws, up to 2 grinders, and 1 drilling machine

  2. Departmental material handling across the eight work areas totaled 1,603 with an overall handling cost of Rp4,535,463

  3. Among ten generated layout alternatives, layout 10 was selected with an adjacency score of 0.80 and a relative distance score of 0.67

Keywords

Facility layout planning, Activity relationship chart, Activity relationship diagram, From to chart, Blocplan

References

M. A. Novianto and S. S. Hervanda, “Perancangan Kursi Santai Menggunakan Metode Pahl and Beitz,” Jurnal Teknik Industri, vol. 4, no. 2, pp. 1–10, 2024.

I. Arbi and H. Rendra, “Perancangan Tata Letak Fasilitas Lantai Produksi pada Pembuatan Sepatu dengan Menggunakan Metode Systematic Layout Planning CV. Sinar Persada Karyatama,” Jurnal Rekayasa Sistem Industri, vol. 6, no. 3, pp. 38–51, 2023.

Hermawan and D. S. Oetomo, Buku Ajar Perancangan Tata Letak. Surabaya, Indonesia: Penerbit Akademika, 2022.

N. M. Wiati, K. Erliana, M. Rofieq, and M. D. Prayogi, “Metode Activity Relationship Chart (ARC) dan Software Blocplan 90: dalam Upaya Pengurangan Jarak Material Handling pada CV Egajaya,” Jurnal Manajemen dan Bisnis, vol. 18, no. 1, pp. 66–77, 2024.

H. I. Abdi and H. Wiwik, “Analisis Tata Letak Fasilitas Produksi dalam Meningkatkan Efisiensi Operasional,” Jurnal Ekonomi dan Bisnis Dharma Andalas, vol. 24, no. 1, pp. 227–241, 2022.

M. I. Taufik, D. Umrah, and D. Djayadiningrat, “Production Layout Optimization Using SLP for Material Handling Cost Efficiency: Optimalisasi Tata Letak Produksi Menggunakan SLP untuk Efisiensi Ongkos Material Handling,” Jurnal Sains dan Teknologi, vol. 7, no. 2, pp. 383–393, 2025.

M. V. Binawan and V. V. Immanuel, “Analisis Perencanaan Luas Pabrik untuk Produk Inovatif Berbasis Ergonomi,” Jurnal Desain dan Rekayasa Industri, vol. 2, pp. 85–94, 2024.

M. Ismi, A. Iksi, and A. Syahrul, “Analisis Material Handling pada Pekerjaan Pembuatan Paving Blok di Suryatama Beton,” Jurnal Teknik Sipil dan Industri, vol. 2, no. 1, pp. 1–10, 2021.

E. Isma, N. Thorndike, Y. Manik, and B. A. Haulian, “Perancangan Tata Letak Fasilitas pada Rumah Produksi Taman Eden 100,” Jurnal Teknik Industri, vol. 8, no. 2, pp. 1–12, 2021.

Y. Setiawannie and N. Marikena, “Pengaruh Perbaikan Tata Letak Fasilitas terhadap Proses Produksi,” Jurnal Manajemen Industri, vol. 3, no. 2, pp. 140–150, 2022.

A. Ayudya, “Perancangan From to Chart (FTC), Perhitungan BMO (Bahan, Mesin, Operator) dan Menggambar Mesin pada Lantai Produksi PT. XYZ,” TALENTA Conference Series, vol. 7, no. 1, pp. 1–8, 2024.

P. Rizki and R. L. Barra, “Perancangan Tata Letak Fasilitas Menggunakan Metode From to Chart dan Activity Relationship Diagram,” Jurnal Ilmiah Research Student, vol. 2, no. 1, pp. 416–429, 2025.

Sugiyono, Buku Ajar Perencanaan Tata Letak Fasilitas (PTLF). Sidoarjo, Indonesia: UMSIDA Press, 2018.

F. Amelia, A. H. Manurung, M. Anggraeni, and N. Maghvira, “Perancangan Ulang Tata Letak Fasilitas Melalui Metode Activity Relationship Chart (ARC) dan Activity Relationship Diagram (ARD),” Jurnal Rekayasa Sistem dan Industri, vol. 3, no. 2, pp. 171–180, 2024.

F. K. Nurrahmat, I. Ruwana, and S. Indriani, “Perancangan Layout Fasilitas Produksi dengan Metode Algoritma BLOCPLAN untuk Mengoptimalkan Material Handling,” Jurnal Valtech, vol. 8, no. 2, pp. 480–487, 2025.

Downloads

Published

2026-11-26

How to Cite

[1]
“Facility Layout of Modular Bear Chair: Layout Pabrik Kursi Modular Beruang ”, PELS, vol. 10, no. 1, pp. 3694–3702, Nov. 2026, doi: 10.21070/xey77c89.

Most read articles by the same author(s)

<< < 1 2 3 4 > >>