1.
Ridloi M, Jakaria RB. Totaliproductive Maintenance (Tpm) Analysis Using the Overall Equipment Effectiveness (Oee) Method and Six Big Losses on an Injection Molding Machine. PELS [Internet]. 2021Jul.14 [cited 2024Nov.21];1(2). Available from: https://pels.umsida.ac.id/index.php/PELS/article/view/938