1.
Planning of the wastewater treat Planning of the wastewater treatment pond wall using reinforced concrete in the Taman Pinang, Sidoarjo: Planning of the wastewater treatment pond wall using reinforced concrete in the Taman Pinang, Sidoarjo Perencanaan dinding kolam IPAL menggunakan beton bertulang Pada Tempat Cuci Mobil di Kawasan Taman Pinang, Sidoarjo. PELS [Internet]. 2026 Nov. 23 [cited 2026 Nov. 24];10(1):3446-52. Available from: https://pels.umsida.ac.id/index.php/PELS/article/view/2783