“Analysis of Daily Progress Reports As a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian Sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain”. Procedia of Engineering and Life Science, vol. 10, no. 1, Nov. 2026, pp. 2918-23, https://doi.org/10.21070/7jzx5w11.