“Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit Train Using the Lean Manufacturing : Analisis Pemborosan Dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing ”. Procedia of Engineering and Life Science, vol. 10, no. 1, Nov. 2026, pp. 3058-65, https://doi.org/10.21070/gs7vsc05.