“Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain” (2026) Procedia of Engineering and Life Science, 10(1), pp. 2918–2923. doi:10.21070/7jzx5w11.