“Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit train using the Lean Manufacturing : Analisis Pemborosan dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing ” (2026) Procedia of Engineering and Life Science, 10(1), pp. 3058–3065. doi:10.21070/gs7vsc05.