“ Analysis of Production Delays in Children’s Game Rides Using the Fault Tree Analysis (FTA) Method: Analisis Keterlambatan Produksi Wahana Permainan Anak Menggunakan Metode Fault Tree Analysis (FTA)” (2026) Procedia of Engineering and Life Science, 10(1), pp. 3310–3317. doi:10.21070/r5z41g64.