“Analysis of Daily Progress Reports As a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian Sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain”. 2026. Procedia of Engineering and Life Science 10 (1): 2918-23. https://doi.org/10.21070/7jzx5w11.