Firmansyah, M. H., & Putra, B. I. (2026). Analysis Of Material Delivery Delays Using Fishbone Diagram And 5W1H Method At PT X: Analisis Penyebab Keterlambatan Pengiriman Material Menggunakan Fishbone Diagram dan Metode 5W1H Pada PT X. Procedia of Engineering and Life Science, 10(1), 203–208. https://doi.org/10.21070/pels.v10i1.3131