Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain. (2026). Procedia of Engineering and Life Science, 10(1), 2918-2923. https://doi.org/10.21070/7jzx5w11