(1)
Analysis of Daily Progress Reports As a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian Sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain. PELS 2026, 10 (1), 2918-2923. https://doi.org/10.21070/7jzx5w11.