(1)
Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit Train Using the Lean Manufacturing : Analisis Pemborosan Dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing . PELS 2026, 10 (1), 3058-3065. https://doi.org/10.21070/gs7vsc05.