[1]
Bisri, M.H. and Cahyana, A.S. 2022. Production Facility Layout Redesign Using Systematic Layout Planning And Blocplan Methods.
Procedia of Engineering and Life Science
. 3, (Dec. 2022). DOI:https://doi.org/10.21070/pels.v3i0.1349.