[1]
2026. Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain. Procedia of Engineering and Life Science. 10, 1 (Nov. 2026), 2918–2923. DOI:https://doi.org/10.21070/7jzx5w11.