[1]
2026. Analysis of Waste in the Underframe (Propulsion) System Installation Process of the KCI-Retrofit train using the Lean Manufacturing : Analisis Pemborosan dalam Proses Pemasangan Sistem Underframe (Porpulsi) Kereta Api KCI-Retrofit Menggunakan Metode Lean Manufacturing . Procedia of Engineering and Life Science. 10, 1 (Nov. 2026), 3058–3065. DOI:https://doi.org/10.21070/gs7vsc05.