[1]
2026. Analysis of Production Delays in Children’s Game Rides Using the Fault Tree Analysis (FTA) Method: Analisis Keterlambatan Produksi Wahana Permainan Anak Menggunakan Metode Fault Tree Analysis (FTA). Procedia of Engineering and Life Science. 10, 1 (Nov. 2026), 3310–3317. DOI:https://doi.org/10.21070/r5z41g64.