Logistics Supply Chain Visibility Training PT. KENCANA MAJU BERSAMA (DISTRIBUTION LIGHT STEEL )
Pelatihan Visibilitas Rantai Pasokan Logistik PT. KENCANA MAJU BERSAMA (DISTRIBUSI BAJA RINGAN )
DOI:
https://doi.org/10.21070/pels.v10i1.2927Keywords:
Light steel, Supply chain visibility, Warehouse layout, Inventory management, Distribution efficiencyAbstract
General Background Modern construction supply chain management requires efficient logistical operations and accurate inventory tracking to maintain project productivity and material flow. Specific Background Light steel manufacturing and distribution facilities, such as PT Kencana Maju Bersama, frequently handle high volumes of construction materials requiring robust warehousing strategies. Knowledge Gap Existing distribution facilities often lack comprehensive evaluations regarding how spatial layout optimization and real-time inventory visibility affect daily loading capacities and error minimization. Aims This study analyzes logistics inventory systems, supply chain visibility, and warehouse spatial layouts to improve operational efficiency and material handling workflows. Results Post-implementation evaluations demonstrate that reorganizing warehouse layouts based on material usage frequency significantly expands daily loading capacity from 10–12 trucks to 20–25 trucks. Novelty The integration of targeted spatial layout re-planning with operational logistics workflow adjustments provides an actionable framework for regional light steel distribution centers. Implications Implementing structured inventory controls and optimized layouts enables distribution enterprises to minimize stockouts, reduce operational delays, and enhance supply chain resilience.
Key Findings Highlights
-
Spatial reorganization based on material movement classification substantially increases daily loading throughput.
-
Digital inventory tracking integration mitigates discrepancies between recorded data and physical stock quantities.
-
Enhanced supply chain transparency directly supports rapid operational decision-making in construction logistics.
Keywords Light steel, Supply chain visibility, Warehouse layout, Inventory management, Distribution efficiency
Downloads
References
[1] M. Caridi, L. Crippa, A. Perego, A. Sianesi, and A. Tumino, "Measuring visibility to improve supply chain performance: A quantitative approach," Benchmarking: An International Journal, vol. 17, no. 4, pp. 593–615, 2010.
[2] A. Gunasekaran, C. Patel, and E. Tirtiroglu, "Performance measures and metrics in a supply chain environment," International Journal of Operations & Production Management, vol. 21, no. 1/2, pp. 71–87, 2001.
[3] T. Hidayat and B. Santoso, "Analisis tata letak gudang untuk meningkatkan produktivitas distribusi," Jurnal Ilmiah Teknik Industri, vol. 20, no. 1, pp. 75–84, 2021.
[4] D. Ivanov, A. Dolgui, and B. Sokolov, "The impact of digital technology and Industry 4.0 on the ripple effect and supply chain risk analytics," International Journal of Production Research, vol. 57, no. 3, pp. 829–846, 2019.
[5] G. Briscoe and A. Dainty, "Construction supply chain integration: An elusive goal?," Supply Chain Management: An International Journal, vol. 10, no. 4, pp. 319–326, 2005.
[6] L. Bankvall, L. E. Bygballe, A. Dubois, and M. Jahre, "Interdependence in supply chains and projects in construction," Supply Chain Management: An International Journal, vol. 15, no. 5, pp. 385–393, 2010.
[7] D. P. Sari and A. Nugraha, "Analisis pengendalian persediaan untuk meminimalkan stockout dan overstock," Jurnal Teknik Industri, vol. 21, no. 2, pp. 123–132, 2020.
[8] R. Wibowo and S. Hartono, "Optimalisasi tata letak material baja ringan pada gudang distribusi menggunakan metode class-based storage," Jurnal Rekayasa Sistem dan Industri, vol. 8, no. 2, pp. 112–120, 2021.
[9] M. Z. Arifin and D. Prasetyo, "Evaluasi rantai pasok material konstruksi di era digital," Jurnal Manajemen Logistik Indonesia, vol. 6, no. 1, pp. 45–53, 2022.
[10] S. Rahardjo and T. Wibowo, "Penerapan warehouse management system untuk meningkatkan akurasi inventaris gudang logistik," Jurnal Ilmiah Teknologi dan Rekayasa, vol. 27, no. 3, pp. 201–210, 2022.
[11] A. Pratama and F. Kusuma, "Analisis efisiensi waktu bongkar muat barang pada pusat distribusi bahan bangunan," Jurnal Teknik Logistik, vol. 4, no. 2, pp. 88–95, 2023.
[12] D. Setiawan and N. L. Fitriani, "Strategi mitigasi risiko stockout pada rantai pasok industri konstruksi," Jurnal Bisnis dan Manajemen, vol. 15, no. 1, pp. 33–42, 2023.
[13] H. Prasetya and R. Yulianto, "Integrasi sistem informasi inventaris berbasis cloud untuk visibilitas rantai pasok yang lebih baik," Jurnal Teknologi Informasi dan Ilmu Komputer, vol. 10, no. 4, pp. 815–824, 2023.
[14] K. A. Nugroho and M. R. Utomo, "Pengaruh tata letak fasilitas terhadap produktivitas tenaga kerja bongkar muat," Jurnal Performa, vol. 22, no. 2, pp. 140–149, 2024.
[15] E. S. Susanto and B. P. Santoso, "Green and lean logistics pada rantai pasok material konstruksi modern," Jurnal Teknik Industri Terpadu, vol. 8, no. 1, pp. 60–69, 2025.
Downloads
Published
Issue
Section
Categories
License
Copyright (c) 2026 Fahri Zakaria Putra Fahri, Hendri Hermawan

This work is licensed under a Creative Commons Attribution 4.0 International License.
