Preparation Of The Budget Plan (RAB) For The PringSewu Cultural Market Development Project

Penyusunan Rencana Anggaran Biaya (RAB) Pada Proyek Pembangunan Pasar Budaya PringSewu

Authors

  • Saskia Nor Rahmadani Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.21070/z6qdx505

Keywords:

Cost Budget Plan (Rab), Construction Cost Estimation, Cultural Market, Project Planning, Budget Control

Abstract

General Background: Construction project planning relies on structured cost estimation to maintain financial feasibility and operational control. Specific Background: The PringSewu Cultural Market development project requires a comprehensive Cost Budget Plan to govern expenditures effectively during implementation. Knowledge Gap: Precise quantification of material proportions, labor allocations, and infrastructural costs for local cultural market developments is rarely detailed systematically in preliminary project documents. Aims: This study aims to estimate total construction costs and establish a reference framework for controlling project expenditures throughout the execution of the PringSewu Cultural Market development. Results: Applying a descriptive quantitative approach revealed a total estimated cost of Rp 13,814,500.00, with market building materials comprising the largest financial proportion, followed by labor and road construction works. Novelty: This research provides an empirical breakdown of cost structures specifically tailored for a community cultural market project combining building and access road components. Implications: Implementing this structured cost budget plan supports efficient resource management, prevents budget overruns, and ensures well-controlled project execution.

Key Findings Highlights

  1. Market building materials represent the largest portion of the total budget at 64.2%.

  2. Labor costs account for 23.8% of the budget, highlighting the significant role of human resources.

  3. Road construction works comprise 12.0% of the total budget, ensuring vital accessibility to the cultural market.

Keywords  Cost Budget Plan (Rab), Construction Cost Estimation, Cultural Market, Project Planning, Budget Control

References

Dipohusodo, Manajemen Proyek Konstruksi, Jakarta: Kanisius, 1996.

Soeharto, Manajemen Proyek: Dari Konseptual sampai Operasional, Jakarta: Erlangga, 1997.

W. I. Ervianto, Manajemen Proyek Konstruksi, Yogyakarta: Andi Offset, 2005.

SNI 7394:2008, Tata Cara Perhitungan Harga Satuan Pekerjaan Beton untuk Konstruksi Bangunan Gedung dan Perumahan, Badan Standardisasi Nasional, 2008.

SNI 3434:2008, Tata Cara Penyusunan Rencana Anggaran Biaya (RAB) Bangunan Gedung, Badan Standardisasi Nasional, 2008.

J. A. Mukomoko, Dasar Penyusunan Anggaran Biaya Bangunan, Jakarta: Gaya Media Pratama, 1987.

B. Ibrahim, Rencana dan Estimate Real of Cost, Jakarta: Bumi Aksara, 2001.

R. J. Kodoatie, Pengantar Manajemen Infrastruktur, Yogyakarta: Pustaka Pelajar, 2005.

Husen, Manajemen Proyek: Perencanaan, Penjadwalan, dan Pengendalian Proyek, Yogyakarta: Andi, 2011.

Suryanto and R. Pratama, "Analisis Penyusunan Rencana Anggaran Biaya (RAB) pada Proyek Bangunan Gedung," Jurnal Teknik Sipil, vol. 12, no. 2, pp. 85–94, 2020.

S. Kurniawan, E. Susanto, and D. Prasetyo, "Penyusunan rencana anggaran biaya bangunan gedung menggunakan analisa harga satuan," Jurnal Infrastruktur, vol. 7, no. 2, pp. 101–109, 2020.

D. L. Sari and H. Santoso, "Analisis perencanaan anggaran biaya sebagai alat pengendalian biaya proyek," Jurnal Ilmiah Teknik Sipil, vol. 10, no. 3, pp. 210–218, 2022.

R. A. Utama and M. Hidayat, "Optimalisasi Penggunaan Material dan Tenaga Kerja dalam Anggaran Biaya Konstruksi," Jurnal Rekayasa Sipil, vol. 16, no. 1, pp. 45–52, 2023. doi: 10.21776/ub.jrs.2023.016.01.6.

Setiawan and T. Wibowo, "Evaluasi Biaya dan Pengendalian Proyek Pembangunan Fasilitas Publik," Jurnal Manajemen Aset dan Infrastruktur, vol. 5, no. 2, pp. 110–118, 2021.

E. M. Susilo and D. Prasetya, "Analisis Estimasi Biaya Konstruksi Berdasarkan Analisa Harga Satuan Pekerjaan (AHSP)," Jurnal Teknik Sipil dan Perencanaan, vol. 24, no. 1, pp. 30–38, 2022.

Downloads

Published

2026-10-31

How to Cite

[1]
“Preparation Of The Budget Plan (RAB) For The PringSewu Cultural Market Development Project: Penyusunan Rencana Anggaran Biaya (RAB) Pada Proyek Pembangunan Pasar Budaya PringSewu”, PELS, vol. 10, no. 1, pp. 1234–1238, Oct. 2026, doi: 10.21070/z6qdx505.