Assembly and Installation of SDP Lighting Panels Assembly dan Instalasi Panel SDP Lighting

Main Article Content

Rizky Habibur Rohman
Izza Anshory

Abstract

Electrical panels have an important role in distributing electrical energy and securing it. One type of
electrical panel that is often used is the SDP Panel (Sub Distribution Panel), especially in the context of lighting. This
article discusses the assembly and installation process of SDP Lighting Panels, which have a crucial role in
maintaining the availability, efficiency and safety of lighting systems. The SDP Panel assembly process involves
preparing components such as MCB (Miniature Circuit Breaker), MCCB (Moulded Case Circuit Breaker), Fuse ,
ELCB (Earth Leakage Circuit Breaker), and other components. After that, these components are carefully assembled
according to the previously prepared design. Next, SDP Panel installation involves installing the panels to a location
according to the plan and connecting them to the building's main power system. Accurate wiring and thorough testing
are necessary to ensure that the panels function properly. It is important to understand that SDP Lighting Panel
installations must comply with applicable electrical safety regulations and standards to avoid the risk of fire, electrical
disturbances or injury. Errors in the installation or assembly process can have a negative impact on the lighting
system and safety. Therefore, a good understanding of the SDP Lighting Panel assembly and installation process is
very important to ensure a reliable, efficient and safe lighting system

Downloads

Download data is not yet available.

Article Details

How to Cite
[1]
R. H. Rohman and I. Anshory, “Assembly and Installation of SDP Lighting Panels”, PELS, vol. 7, pp. 217 - 222, Mar. 2024.
Section
Electrical Engineering

References

[1] Abdul Azis Fitriaji, & Aswin Domodite. (2022). Analisis Upaya Meningkatkan Kualitas Produksi Panel Listrik
Guna Mengurangi Defect Menggunakan Metode DMAIC. TEKNOSAINS : Jurnal Sains, Teknologi Dan
Informatika, 9(2), 90–100. https://doi.org/10.37373/tekno.v9i1.226
[2] AJI, V. P. (2021). Rancangan Sistem Kontrol Dan Monitoring Substation Distribution Panel ( Sdp ) Berbasis
Web Rancangan Sistem Kontrol Dan Monitoring Substation Distribution Panel ( Sdp ) Berbasis Web. 1–6.
[3] Harianto, E. V., & Mustamu, R. H. (2014). Analisis Strategi Bersaingan Perusahaan Panel Listrik. Agora,
2(1)(1), 1–10. http://publication.petra.ac.id/index.php/manajemenbisnis/article/view/1523%0Ahttp://publication.petra.ac.id/index.php/manajemenbisnis/article/download/1523/1376
[4] Lindawati, S. (2016). Penggunaan Metode Deskriptif Kualitatif Untuk Analisis Strategi Pengembangan
Kepariwisataan Kota Sibolga Provinsi Sumatera Utara. Seminar Nasional APTIKOM (SEMNASTIKOM), Hotel
Lombok Raya Mataram, 833–837.
[5] Somadani, D., & Ginanjar, A. H. (2018). Prototipe Penerangan Jalan Umum (Pju) Pintar Berbasis Arduino
Menggunakan Solar Panel, Sensor Hc-Sr04 Dan Sensor Ldr. Prosiding Semnastek, PROSIDING SEMNASTEK