Improving Working Method of Label Cutting Station in the Jago Jaya Shuttlecock Industry for Increases Productivity


Perbaikan Metode Kerja Stasiun Pemotongan Label di Industri Shuttlecock Jago Jaya untuk Meningkatkan Produktivitas


  • (1) * Rahmaniyah Dwi Astuti            Universitas Sebelas Maret  
            Indonesia

  • (2)  Bambang Suhardi            Universitas Sebelas Maret  
            Indonesia

  • (3)  Irwan Iftadi            Universitas Sebelas Maret  
            Indonesia

  • (4)  Afra Galda Nadhira            Universitas Sebelas Maret  
            Indonesia

  • (5)  Annisa Syahliantina            Universitas Sebelas Maret  
            Indonesia

    (*) Corresponding Author

Abstract

The process of cutting labels at the Jago Jaya Industry Shuttlecock has not implemented efficient working methods, so production targets are not achieved. This study aims to improve the working method of the workstation through the implementation of a label cutting tool in the Jago Jaya industry. The method used to analyze hand movements uses the Right Hand and Left Hand Map. Improved operator hand movements to be more balanced so as to increase productivity at the label cutting workstation. The time required to cut 50 labels was reduced from 72 seconds to 46 seconds after the application of the cutting tool and the change in the placement of the equipment closer to the operator. After the implementation of the pacemaker, the ineffective movements of the left hand were eliminated, such as 8 times from 10 to 2 times and 4 times from 6 to 2 times. Meanwhile, on the right, campaigns were held 1 time, from 5 times to 4 times.

Downloads

Download data is not yet available.

References

[1] B. Arianto, “Pengembangan UMKM digital di masa pandemi covid-19,” ATRABIS J. Adm. Bisnis, vol. 6, no. 2, pp. 233–247, 2020.
[2] S. I. Kaban, R. D. Astuti, and E. Pujiyanto, “Perancangan Alat Pemotong Label untuk Meminimasi Gerakan Repetitive Pekerja di Industri Jago Jaya Shuttlecock Surakarta,” Matrik J. Manaj. dan Tek. Ind. Produksi, vol. 22, no. 1, pp. 65–72, 2021.
[3] R. Yasra, N. T. Putri, and M. Rozaq, “Perbaikan Metode Kerja Pada Proses Set Up Untuk Meningkatkan Produktivitas Machining Gate Valve di PT Cameron System Batam,” PROFISIENSI J. Progr. Stud. Tek. Ind., vol. 9, no. 1, pp. 60–73, 2021.
[4] B. E. Sembiring, F. Nuzullisya, and R. Cahyadi, “Perbaikan Waktu Kerja Pada Bagian Produksi Tamiya Dengan Menggunakan Peta Tangan Kiri Dan Tangan Kanan,” Bull. Appl. Ind. Eng. Theory, vol. 1, no. 2, 2020.
[5] G. K. Dewanti, “Analisis Metode Kerja Perakitan Kipas Angin Pada Proses Servis Kipas Angin Menggunakan Peta Tangan Kiri dan Tangan Kanan,” STRING (Satuan Tulisan Ris. dan Inov. Teknol., vol. 5, no. 1, p. 11, 2020, doi: 10.30998/string.v5i1.5887.
[6] S. Wignjosoebroto, “Ergonomi Studi Gerak dan Waktu, Surabaya.” Guna Widya, 2008.
[7] M. Muchlisin, R. P. Ramadhandy, R. F. Rosyid, and S. M. Sugito, “Usulan Perbaikan Metode Kerja Pada Produksi Mur di PT Tiga Sinar Mandiri Dengan Man and Machine Chart,” Bull. Appl. Ind. Eng. Theory, vol. 3, no. 1, pp. 65–70, 2022, [Online]. Available: http://www.jim.unindra.ac.id/index.php/baiet/article/view/6530.
[8] F. Susanti, “Analisis Postur Kerja sebagai Upaya Mengurangi Risiko Musculoskeletal Disorders pada Karyawan Bagian Gudang Non Medis Rumah Sakit Kasih Ibu Surakarta,” 2015.
[9] I. D. Kurniawan, J. Susetyo, and R. A. Simanjuntak, “PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING (SLP) DAN PETA TANGAN KANAN TANGAN KIRI PROSES PERAKITAN,” J. Rekavasi, vol. 8, no. 2, pp. 13–22, 2020.
[10] R. D. Astuti and I. Iftadi, Analisis dan Perancangan Sistem Kerja. Deepublish, 2016.
Picture in here are illustration from public domain image (License) or provided by the author, as part of their works
Published
2023-07-07
 
How to Cite
[1]
R. D. Astuti, B. Suhardi, I. Iftadi, A. G. Nadhira, and A. Syahliantina, “Improving Working Method of Label Cutting Station in the Jago Jaya Shuttlecock Industry for Increases Productivity”, PELS, vol. 4, Jul. 2023.